Inspections for the day of: Monday, November 21, 2005.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02157 BLD-Aging Inspection11/21/200511/21/200511/22/2005 4:11:47 PMPPASS
Life safety passed on 9/19/05 -c/n items were completed.
FIR05-00689 INSP-Final Inspection11/21/200511/21/200511/21/2005 5:25:11 PMPPART
Corrections have been completed, fire sprinkler work is satisfactory, final pending shell permit finals, currently on a temp.
BLD05-02474 FIRE-Final Inspection11/21/200511/21/200511/21/2005 5:23:29 PMPPART
Life safety is acceptable, final pending shell permit finals, currently on a temp.
BLD05-02359 FIRE-Final Inspection11/21/200511/21/200511/21/2005 5:22:15 PMPPART
Life safety is acceptable, final pending shell alarm and sprinkler final, currently on a temp. Note ceiling tiles to be replaced-need to verify sprinkler canopies have been reinstalled.
BLD05-02222 FIRE-Final Inspection11/21/200511/21/200511/21/2005 5:19:16 PMPPART
Life safety is acceptable, final pending shell permits final approval, currently on a temp.
BLD05-02476 FIRE-Final Inspection11/21/200511/21/200511/21/2005 4:01:10 PMPNR
The related fire sprinkler permit is not issued at this time.
BLD05-02475 FIRE-Final Inspection11/21/200511/21/200511/21/2005 4:00:07 PMPNR
The related fire sprinkler permit is not issued at this time.
BLD05-02432 FIRE-Final Inspection11/21/200511/21/200511/21/2005 3:56:50 PMPNR
The related fire alarm permit must be inspected and approved prior to life safety final.
FIR05-00453 INSP-Final Inspection11/18/200511/21/200511/21/2005 3:49:48 PMPCANC
Rescheduled for 11/22
FIR05-00666 INSP-Alarm Testing11/21/200511/21/200511/21/2005 3:43:30 PMPCANC
Inspection has been rescheduled for 11/22 pm as discussed.
FIR05-00499 INSP-Supply line flush11/18/200511/21/200511/21/2005 2:26:52 PMAPART
UG fire supply line flush performed satisfactory.
FIR05-00499 INSP-Sprinkler Rough-in/Hydro11/18/200511/21/200511/21/2005 2:09:25 PMAPART
UG hydrostatic test passed within the allowable leakage allowance per NFPA.
FIR05-00595 INSP-Final Inspection11/21/200511/21/200511/21/2005 2:04:49 PMPDEFR
Inspection scheduled for 11/22 am per agreement.
FIR05-00618 INSP-Final Inspection11/21/200511/21/200511/21/2005 2:02:02 PMPDEFR
Inspection to be completed on 11/22 am.
MIS05-00207 FIR-Final11/18/200511/21/200511/21/2005 1:18:32 PMPPASS
Life safety is satisfactory.
BLD05-00458 FIRE-Final Inspection11/18/200511/21/200511/21/2005 11:08:36 AMAFAIL
Basement is missing one exit sign as red lined on plans, doors in four locations are equipped with non-approved thumbturn hardware, 1st floor requires one additional fire ext., one discharge emergency light is not installed, hardware at the handicap accessible elevator lobby door is incorrect, need to final sprinkler and alarm permits prior to signature for the life safety.
FIR05-00684 INSP-Alarm Testing11/21/200511/21/200511/21/2005 10:48:14 AMPCANC
Scheduled by a contractor via Hello! on 11/21/2005 at 10:14:39 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 21 2005 10:48AM.
BLD05-02432 FIRE-Final Inspection11/16/200511/21/200511/21/2005 9:43:39 AMANR
The related fire alarm permit work must be inspected and approved prior to life safety inspection and final.
FIR05-00592 INSP-Final Inspection11/18/200511/21/200511/21/2005 9:40:30 AMAPASS
The required correction has been completed, fire sprinkler finaled.
FIR05-00591 INSP-Final Inspection11/18/200511/21/200511/21/2005 9:38:49 AMAPASS
Corrections have been made, sprinkler permit finaled.
BLD05-00011 FIRE-Final Inspection11/21/200511/21/200511/21/2005 12:00:00 AMAFAIL
Need to install emergency lighting as required, repair hardware at the main entry/exit.