Inspections for the day of: Thursday, November 21, 2013.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00363 Site Final11/21/201311/21/201311/21/2013 4:53:28 PMACANC
10:00 AM
ESC13-00358 Site Final11/20/201311/21/201311/21/2013 4:37:16 PMAPASS
DARREN Phone #: ###-####

Finaled.
ESC13-00358 DOC - Permit Finaled11/21/201311/21/201311/21/2013 4:37:02 PMPPASS
ESC conditions met.
ESC13-00858 General Inspection11/21/201311/21/201311/21/2013 3:55:31 PM PASS
Pool is installed. Hillside has biodegradable wattle staked in. Lot has been stabilized. Can be finaled with rest of house. No corrections at this time.
ESC12-01155 General Inspection11/21/201311/21/201311/21/2013 3:09:15 PM PASS
BLD permits is finaled, hillside still needs stabilization and down slope silt fence should stay installed. DI at end of driveway has new filter installed. Will continue to monitor.
ESC13-00870 General Inspection11/21/201311/21/201311/21/2013 2:56:33 PM PASS
WIP on rear exterior addition. No ESC violations observed.
ESC13-00749 General Inspection11/21/201311/21/201311/21/2013 2:32:34 PM PASS
WIP. Hillslopes have been tracked to slow/absorb runoff. Sediment basin at low southeast corner of lot and wattles. No trackout. Approved.
ESC12-01011 General Inspection11/21/201311/21/201311/21/2013 2:24:45 PM PASS
Finaled.
ESC12-01011 DOC - Permit Finaled11/21/201311/21/201311/21/2013 2:24:26 PMPPASS
Construction is finished. House is landscaped. Backyard has been hydroseeded and grass is taking root - 1 wattle remains to aide stabilization. BLD permit has been finaled. No further ESC inspections
ESC12-01127 General Inspection11/21/201311/21/201311/21/2013 2:01:01 PM PASS
Wattles installed on downslope of site. Home is complete and landscaped, BLD permit is open. Slope is in process of vegetating. No corrections at this time.
ESC12-00526 General Inspection11/21/201311/21/201311/21/2013 1:49:13 PM PASS
Finaled. See activity notes.
ESC12-00526 DOC - Permit Finaled11/21/201311/21/201311/21/2013 1:48:53 PMPPASS
Structure is complete. No activity on BLD in over a year. ESC permit is expired and conditions have been met. No further ESC inspections required.
ESC13-01104 Site Preparation11/21/201311/21/201311/21/2013 12:06:06 PMPPASS
Kristy Phone #: ###-#### (wood bros)

BMPs and sign are in place. Trench dug to channel water/dirt away from street. Approved.

RP is Joe Lords of Tresidio Homes # ###-####

ESC13-01147 Site Preparation11/20/201311/21/201311/21/2013 11:18:46 AMAPASS
Braxton Phone #: ###-####

Site is ready for excavation. Temporary construction/tractor access is to be provided. Excavation starting this afternoon. Riverside Heights #5 BMPs are in good condition.
ESC13-01000 Site Preparation11/21/201311/21/201311/21/2013 11:06:44 AMPPASS
Clint Phone #: ###-####

Permit posted, washout provided, adjacent DIs have filter protection. Large puddle adjacent to lot must be avoided.
ESC13-01128 Site Preparation11/20/201311/21/201311/21/2013 10:59:28 AMAPASS
ROLLO Phone #: ###-####


Met Rollo, Hunter Homes RP and Wood Bros excavator Angel on site. Permits are posted. Construction access will be through the alley, down slope BMPs will be added as needed. Drop inlets have protection and concrete washout in development. Approved for excavation.
ESC13-01117 Site Preparation11/20/201311/21/201311/21/2013 10:59:03 AMAPASS
ROLLO Phone #: ###-####


Met Rollo, Hunter Homes RP and Wood Bros excavator Angel on site. Permits are posted. Construction access will be through the alley, down slope BMPs will be added as needed. Drop inlets have protection and concrete washout in development. Approved for excavation.
ESC13-01116 Site Preparation11/20/201311/21/201311/21/2013 10:58:36 AMAPASS
ROLLO Phone #: ###-####

Met Rollo, Hunter Homes RP and Wood Bros excavator Angel on site. Permits are posted. Construction access will be through the alley, down slope BMPs will be added as needed. Drop inlets have protection and concrete washout in development. Approved for excavation.