ELE16-03788
| Electrical Rough-In | 11/19/2016 | 11/21/2016 | 11/21/2016 2:00:27 PM | P | PASS |
|
|
Electrical rough-in Phone #: ###-#### Inspection requested via web by Jarod Murray ok cover
|
MIS16-00369
| ELE-Conference | 11/18/2016 | 11/21/2016 | 11/21/2016 2:00:04 PM | A | DONE |
|
|
possible work being done without permits Stopped by said address, no access. Knocked on door no answer. Will check tomorrow morning and leave correction notice to contact me with possible life safety concerns.
|
ELE16-00442
| Electrical Rough-In | 11/21/2016 | 11/21/2016 | 11/21/2016 12:49:48 PM | P | PASS |
|
|
Jake Phone #: ###-#### Lt pole on W side, and rest of 5th floor ceilings
|
ELE16-03641
| Electrical Rough-In | 11/20/2016 | 11/21/2016 | 11/21/2016 12:22:45 PM | P | PASS |
|
|
floor heat Phone #: ###-#### Inspection requested via web by cal crosby ok cover
|
ELE16-03010
| Final | 11/18/2016 | 11/21/2016 | 11/21/2016 10:13:28 AM | A | NR |
|
|
Chris is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
|
ELE16-03484
| Electrical Rough-In | 11/20/2016 | 11/21/2016 | 11/21/2016 9:34:00 AM | A | PASS |
|
|
Garage is in back and there is no garage door installed yet. Phone #: ###-#### Inspection requested via web by todd cline ok cover. Upon final garage panel needs 60a breaker and correct wiring if needed. 230.79(D)
|
ELE16-03760
| Rough-In Permanent Service | 11/18/2016 | 11/21/2016 | 11/21/2016 9:01:11 AM | A | PASS |
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok
|
ELE16-02387
| Final | 11/18/2016 | 11/21/2016 | 11/21/2016 8:49:45 AM | A | NR |
|
|
Pete Phone #: ###-####
|