Inspections for the day of: Monday, November 21, 2016.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-03788 Electrical Rough-In11/19/201611/21/201611/21/2016 2:00:27 PMPPASS
Electrical rough-in Phone #: ###-#### Inspection requested via web by Jarod Murray ok cover
MIS16-00369 ELE-Conference11/18/201611/21/201611/21/2016 2:00:04 PMADONE
possible work being done without permits Stopped by said address, no access. Knocked on door no answer. Will check tomorrow morning and leave correction notice to contact me with possible life safety concerns.
ELE16-00442 Electrical Rough-In11/21/201611/21/201611/21/2016 12:49:48 PMPPASS
Jake Phone #: ###-#### Lt pole on W side, and rest of 5th floor ceilings
ELE16-03641 Electrical Rough-In11/20/201611/21/201611/21/2016 12:22:45 PMPPASS
floor heat Phone #: ###-#### Inspection requested via web by cal crosby ok cover
ELE16-03010 Final11/18/201611/21/201611/21/2016 10:13:28 AMANR
Chris is the contact his cell no is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates
ELE16-03484 Electrical Rough-In11/20/201611/21/201611/21/2016 9:34:00 AMAPASS
Garage is in back and there is no garage door installed yet. Phone #: ###-#### Inspection requested via web by todd cline ok cover. Upon final garage panel needs 60a breaker and correct wiring if needed. 230.79(D)
ELE16-03760 Rough-In Permanent Service11/18/201611/21/201611/21/2016 9:01:11 AMAPASS
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok
ELE16-02387 Final11/18/201611/21/201611/21/2016 8:49:45 AMANR
Pete Phone #: ###-####