BLD19-04525
| BLD-Final | 11/21/2019 | 11/21/2019 | 11/21/2019 3:34:06 PM | P | DONE |
|
|
Larry Phone #: ###-####
|
BLD19-04525
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 3:33:57 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD19-02014
| BLD-Wall Bracing | 11/20/2019 | 11/21/2019 | 11/21/2019 3:33:24 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-02648
| BLD-Other | 11/21/2019 | 11/21/2019 | 11/21/2019 2:25:11 PM | P | DONE |
|
|
Confirm applicant has vacated space - now occupying unit 104 Phone #: ###-####
|
BLD19-02648
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 2:25:04 PM | P | PASS |
|
|
Tenant has vacated the space.
|
BLD19-03278
| BLD-Conference | 11/21/2019 | 11/21/2019 | 11/21/2019 2:24:43 PM | P | DONE |
|
|
verify tenant has vacated the building to FNL permit Phone #: ###-####
|
BLD19-03278
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 2:24:35 PM | P | PASS |
|
|
Tenant has vacated the space.
|
BLD19-03384
| BLD-Wall Bracing | 11/21/2019 | 11/21/2019 | 11/21/2019 2:24:09 PM | P | PASS |
|
|
Jeff Phone #: ###-####
|
BLD19-04368
| BLD-Final | 11/21/2019 | 11/21/2019 | 11/21/2019 1:36:17 PM | P | PASS |
|
|
|
BLD19-04368
| DOC - Permit Finaled | 11/21/2019 | 11/21/2019 | 11/21/2019 1:36:07 PM | P | PASS |
|
|
|
BLD19-04368
| BLD-Footing | 11/20/2019 | 11/21/2019 | 11/21/2019 1:35:57 PM | P | PASS |
|
|
An early PM inspection for this would be the best if possible. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD19-03364
| BLD-Foundation | 11/21/2019 | 11/21/2019 | 11/21/2019 1:16:10 PM | P | CANC |
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD19-03364
| BLD-Footing | 11/21/2019 | 11/21/2019 | 11/21/2019 1:16:03 PM | P | PASS |
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD19-04172
| BLD-Foundation | 11/20/2019 | 11/21/2019 | 11/21/2019 1:07:46 PM | P | PASS |
|
|
Dane- foundation wall Phone #: ###-####
|
BLD19-04169
| BLD-Foundation | 11/20/2019 | 11/21/2019 | 11/21/2019 11:59:39 AM | A | PASS |
|
|
Dane- foundation wall Phone #: ###-####
|
BLD19-04173
| BLD-Foundation | 11/20/2019 | 11/21/2019 | 11/21/2019 11:59:22 AM | A | PASS |
|
|
Dane- foundation wall Phone #: ###-####
|
BLD19-02012
| BLD-Framing/Rough-in | 11/20/2019 | 11/21/2019 | 11/21/2019 11:36:50 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Trusses not fully seated in hangars in garage at 2 ply girder. ok to insulate.
|
BLD19-00733
| BLD-Energy code compliance | 11/20/2019 | 11/21/2019 | 11/21/2019 11:02:11 AM | A | PASS |
|
|
not ready until 10 am // Kevin Phone #: ###-####
|
BLD19-04327
| BLD-Wall cover | 11/20/2019 | 11/21/2019 | 11/21/2019 9:50:23 AM | A | PART |
|
|
text for lock box code // Ethan Phone #: ###-####. No new framing or electrical work. will pull plumbing and mecg. permits for new duct work amd fixtures. Needs to complete aireseal prior to insulation and call for inspection.
|
BLD19-01556
| BLD-Final | 11/20/2019 | 11/21/2019 | 11/21/2019 9:13:45 AM | A | PEND |
|
|
Barney Phone #: ###-####. Need final letter from special inspection agency and zoning final.
|
BLD19-03364
| BLD-Footing | 11/20/2019 | 11/21/2019 | 11/21/2019 8:47:47 AM | A | FAIL |
|
|
Sam Phone #: ###-####. Column pad footings not the min. 10 inches deep per the approved plans. Also noted that ground, rebar and form work below the min. 34 degress required for concrete placement.
|