Inspections for the day of: Thursday, November 21, 2019.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Reynolds
TitleMEC INSPECTOR
Phone #208-803-2395
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC19-05251 Rough-in11/20/201911/21/201911/21/2019 4:34:22 PMPPASS
Second layer of wrap inspection. Call Dave with questions.
###-####
Thank you Phone #: ###-#### Inspection requested via web by Dave DeChambeau
- 2nd layer fire wrap ok
MEC19-03802 Rough-in11/21/201911/21/201911/21/2019 4:14:25 PMPPART
after 2 // Tom Phone #: ###-####
- fireplace venting ok
- still need to see gas pressure test and framing finished
MEC19-04673 Final11/21/201911/21/201911/21/2019 3:12:53 PMPFAIL
tenant =Jenese ###-#### -thank you! ~Carlene. Phone #: ###-#### Inspection requested via web by Jesica Currie
- need to witness 5lb flue pressure test
MEC19-05211 Final11/18/201911/21/201911/21/2019 3:06:19 PMPPASS
Space number 36

Please call Dave when on the way tp ensure install is complete. Thank you! ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg
- furnace only co ok
MEC19-05099 Rough-in11/21/201911/21/201911/21/2019 2:55:37 PMPPASS
R/I Inspection. Please contact Mark prior to coming out to the job site ###-#### Phone #: ###-#### Inspection requested via web by Commercial Coordinator
- R/I ok
MEC19-04033 Final11/21/201911/21/201911/21/2019 2:13:53 PMPPASS
CALL ###-#### OR ###-#### OR PROJECT MANAGER JASON AT ###-#### FOR ACCESS Phone #: ###-#### Inspection requested via web by Aaron Alandt
-final ok
MEC19-05259 Final11/21/201911/21/201911/21/2019 2:11:39 PMPNH
Homeowners name is Dan ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd
- left a business card with lady who answered front door. She seemed confused and not sure what was happening and wouldn't let me in. Called number in notes aswell and no answer
MEC19-05243 Final11/20/201911/21/201911/21/2019 1:16:56 PMPPASS
Please call when in route to home ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd
- furnace ac coil co ok
MEC19-03990 Rough-in11/21/201911/21/201911/21/2019 12:57:15 PMPFAIL
cover for 2nd floor Phone #: ###-#### Inspection requested via web by Brandon Sorensen
- all duct work above unconditioned ceiling space needs insulated
MEC19-04614 Rough-in11/18/201911/21/201911/21/2019 12:55:09 PMPPASS
Phone #: ###-#### Inspection requested via web by Randy Hart
- R/I ok
- lower combustion opening will be done by final
MEC19-04614 Pressure Test11/19/201911/21/201911/21/2019 12:54:35 PMPPASS
Phone #: ###-#### Inspection requested via web by Randy Hart
- 20lb gas pressure test ok
- tagged meter location
MIS19-00398 MEC-Conference11/21/201911/21/201911/21/2019 10:24:54 AMPDONE
possible unpermitted work being done Phone #: ###-####
- Right Now HVAC has permit for system and gas line being installed.
MEC19-05227 Pressure Test11/20/201911/21/201911/21/2019 10:23:47 AMAPASS
Gauge outside Phone #: ###-#### Inspection requested via web by Mary LaFayette
- 20lb gas pressure test only ok
- will need to see R/I for ceiling cover in basment
- need to also add duct work to permit and if an A/C is being installed need to add item to permit
MEC19-04946 Final11/20/201911/21/201911/21/2019 10:19:44 AMAFAIL
Please Call Ahead, ###-#### to Crystal for access between 10am to 1pm for final; or call Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley
- line set at indoor coil needs more insulation installed
- secondary drain on new coil needs a wet switch
- condensate pump needs safety switch wired
- need to installed co sensors both upstairs and downstairs
- where common vent penetrates masonary chimney needs draft stop installed
MEC19-05228 Final11/19/201911/21/201911/21/2019 9:31:09 AMAFAIL
Phone #: ###-#### Inspection requested via web by Mary LaFayette
- need 5lb flue witness test
MEC19-05148 Final11/19/201911/21/201911/21/2019 9:29:29 AMACANC
Phone #: ###-#### Inspection requested via web by Mary LaFayette
- locking caps ok
- final ok
MEC19-04673 Final11/19/201911/21/201911/21/2019 9:15:26 AMACANC
the tenant said IF you prefer afternoon please give her a heads-up and she''ll be there. tenant =Jenese ###-#### -thank you! ~Carlene. Phone #: ###-#### >> Inspection requested via web by Carlene Badillo Inspection cancelled from web by: Jesica Currie
MEC19-05251 Rough-in11/20/201911/21/201911/21/2019 8:47:21 AMAPASS
First layer of wrap inspection. Call Dave with questions.
###-####
Thank you Phone #: ###-#### Inspection requested via web by Dave DeChambeau
- 1st layer wrap on round grease duct ok
MEC19-00425 Final11/20/201911/21/201911/21/2019 8:31:33 AMAPASS
call Nelson 30 minutes before ###-#### Inspection requested via web by Sheldon Lebow
- fireplace final ok
MEC19-00425 Final11/20/201911/21/201911/20/2019 2:09:39 PMACANC
>> Inspection requested via web by Sheldon Lebow Inspection cancelled from web by: Sheldon Lebow
MEC19-04614 Pressure Test11/19/201911/21/201911/19/2019 1:37:55 PMACANC
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart