ELE99-03498
| Rough-In Permanent Service | 11/21/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/21/1999 at 23:10:22. Contact: ###-####. (JMS) Ele. R/I; perm. Svc. (duplex).
|
ELE99-02873
| Final | 11/19/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | A | PASS |
|
|
###-#### JAMES (JMS) ok.
|
ELE98-03761
| Final | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | A | CANC |
|
|
Homeowner canceled inspection.
|
ELE99-03988
| Final | 11/18/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 08:13:09. Contact: . Ok.
|
ELE98-03761
| Final | 11/19/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | CANC |
|
|
RON ###-####
|
ELE99-03456
| Rough-In Permanent Service | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PART |
|
|
2 and 3rd floor r/i and service jim ###-#### building #3 Ele. R/I; service panel. Bld.#3; 2nd & 3rd floors.
|
ELE99-04121
| Temporary Service | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PASS |
|
|
brent ###-#### temp pole reinspection Temp. pole.
|
ELE99-03064
| Electrical Rough-In | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PART |
|
|
underground steve ###-#### Underground PVC.
|
ELE99-04215
| Electrical Rough-In | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 08:46:59. Contact: ###-####. SE perimeter walls Ele. R/I; 2nd floor.
|
ELE99-04209
| Electrical Rough-In | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PART |
|
|
conf\\###-#### Conference; main service gear.
|
ELE99-04216
| Rough-In Permanent Service | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PART |
|
|
20 ROOMS 2 A/C 200 AMPS JOHN ###-#### Per. Service only. Correction posted for Ele. R/I Nec. 300-22(o). Called contractor.
|
ELE99-04189
| Permanent Service | 11/22/1999 | 11/22/1999 | 11/22/1999 12:00:00 AM | P | PASS |
|
|
EARLY PM FINAL ###-#### Service panel change.
|