BLD02-00311
| BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PART |
|
|
###-#### ceilings in portion of structure inspection areas noted in job trailer. 11/22/2002 12:31:03 PM
|
BLD02-01804
| BLD-Energy code compliance | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PART |
|
|
Would like energy compliance inspection on south side of duplex to permit installing of insulation in walls and authorization to install sheetrock on ceilings of south side. Would like approval of insulation in walls on north side and authorization to cover exterior walls with sheetrock. Key for front doors is in black tube on back of sign in front of house. Approved set of plans are also in tube.; Phone #: ###-#### Internet Inspection Request from: Dean McKellip. NOTE:an inspection for framing was done on the north side by 301 on 11/14/02.Lfet side (north) ONLY OK TO DRYWALL. 11/22/2002 2:24:43 PM
|
BLD01-01180
| BLD-Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | DONE |
|
|
can you doc final this?? thanks lindathis was approved 3/15/02. 11/22/2002 10:10:09 AM
|
MEC02-03451
| Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted. 11/22/2002 11:18:44 AM
|
MEC02-03451
| Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted. 11/22/2002 11:18:44 AM
|
MEC02-03451
| Pressure Test | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-03451
| Pressure Test | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-02581
| BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie1 room ceiling. 11/22/2002 11:45:50 AM
|
BLD02-02818
| BLD-Foundation | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PART |
|
|
###-#### CARL . FOUNDATION IS POURED. 11/22/2002 2:41:56 PM
|
MEC02-03417
| Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-03417
| Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-03457
| Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/21/2002 at 16:43:43. Contact: ###-####.
|
MEC02-03443
| Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
MIKE- ###-####-FOR DUPLEX- FOR A & B. posted c/n on water heater in center of units.. 11/22/2002 2:06:03 PM
|
MEC02-03443
| Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
MIKE- ###-####-FOR DUPLEX- FOR A & B. posted c/n on water heater in center of units.. 11/22/2002 2:06:03 PM
|
BLD02-00149
| BLD-Final | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/21/2002 at 17:23:26. Contact: ###-####.The landing at the rear door is not minimum 3 out,called contractor and notified also still unable to find plumbing permit, might be adda county,contractor will check out. 11/22/2002 10:03:04 AM
|
MEC02-03274
| Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 06:08:39. Contact: 089412315.
|
MEC02-03272
| Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 06:09:44. Contact: 089412315.
|
BLD01-01778
| BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
Stoped by job and notified and posted c/n to remove paper at areas that have been sided with out approval. NOTE THIS IS A FULLY ENGINEERED STRUCTURE. and may require engineer of record to sign off. Called and left a message with steve l and home owner on site. 11/22/2002 10:35:57 AM
|
BLD01-01778
| BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | CANC |
|
|
|
MEC02-03451
| Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted. 11/22/2002 11:18:44 AM
|
MEC02-03451
| Pressure Test | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-03325
| Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
###-####recalled for monday out of time. 11/22/2002 4:47:06 PM
|
MEC02-03325
| Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
recalled for monday out of time. 11/22/2002 4:47:23 PM
|
BLD02-02764
| BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-02121
| BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
went over the screen wall requirements, this wall will not be above 6 foot high, and does not require a bld permit. 11/22/2002 4:29:23 PM
|
MEC02-02431
| Final | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 06:14:30. Contact: ###-####. recalled for monday.out of time. 11/22/2002 4:45:57 PM
|
MEC02-02430
| Final | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 06:16:30. Contact: ###-####.recalled for monday out of time 11/22/2002 4:46:12 PM
|
BLD02-02337
| BLD-Final | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 07:41:24. Contact: ###-####.recalled for monday out of time. 11/22/2002 4:47:36 PM
|
MEC02-03274
| Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | NR |
|
|
|
MEC02-03272
| Pressure Test | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
PIPE IN TENNANT WALL AND TRUNK ABOVE ONLY. 11/22/2002 3:47:29 PM
|
BLD02-01350
| BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 10:09:09. Contact: ###-####.recalled for monday out of time. 11/22/2002 4:47:50 PM
|
BLD02-02321
| BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PASS |
|
|
gordon ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD02-02384
| BLD-Footing | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | CANC |
|
|
###-####recalled for monday out of time. 11/22/2002 4:46:26 PM
|
BLD02-01851
| BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
###-####, WROTE A C/N ON PRIOR C/N FROM 340 TO ADD THE INTERIOR SIDE OF THE EST WALL AS SHOWN ON PLANS. 11/22/2002 4:15:44 PM
|