MIS02-00228
| FIR-Final | 11/20/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
duct detectors have been installed. Life safety finaled 11/22/2002 8:40:51 AM
|
FIR02-00426
| INSP-Sprinkler Rough-in/Hydro | 11/20/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PART |
|
|
underground hydro is ok and the underground flush is ok 11/22/2002 2:46:06 PM
|
FIR02-00377
| INSP-Sprinkler Rough-in/Hydro | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
rough-in is ok. sprinklers are ok cover pending the contractor supplying verification that the sprinkler piping can be hung from the mechanical systems uni-strut 11/22/2002 9:48:15 AM
|
FIR02-00412
| INSP-Final Inspection | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
###-#### fire sprinklers finaled 11/22/2002 3:53:30 PM
|
BLD02-00713
| FIRE-Final Inspection | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
access pad has been poured. life safety finaled 11/22/2002 8:53:54 AM
|
BLD02-02637
| FIRE-Final Inspection | 11/21/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | A | PASS |
|
|
life/safety finaled. The door hardware for the restrooms was being installed during the inspection and appears to be correct 11/22/2002 11:33:18 AM
|
FIR02-00311
| INSP-Sprinkler Rough-in/Hydro | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PASS |
|
|
the specific areas that have roughin approved and are ok to cover have been marked on the job site approved sprinkler plans with todays date and signature 11-22-02 11/22/2002 4:35:27 PM
|
BLD02-02453
| FIRE-Final Inspection | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
a temporary occupancy was given with dave millers permission. The only item left is duct detectors on three of the hvac units. the duct detectors are being installed today and a final inspection should be called in for monday 11/22/2002 11:46:14 AM
|
BLD02-02453
| FIRE-Final Inspection | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
a temporary occupancy was given with dave millers permission. The only item left is duct detectors on three of the hvac units. the duct detectors are being installed today and a final inspection should be called in for monday 11/22/2002 11:46:14 AM
|
BLD02-02200
| FIRE-Final Inspection | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PART |
|
|
a temp. occupancy was given with dave millers permission until the fire alarm drawings have been approved, devices installed and tested 11/22/2002 3:47:04 PM
|
FIR02-00403
| INSP-Final Inspection | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-02001
| BLD-Other | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | FAIL |
|
|
the electrical contractor is installing/modifying the fire alarm system in this tenant space without a fire alarm permit. I left a violation notice which I had the installer sign stating that no work is to be continued.
|
BLD02-02001
| BLD-Other | 11/22/2002 | 11/22/2002 | 11/22/2002 12:00:00 AM | P | FAIL |
|
|
the electrical contractor is installing/modifying the fire alarm system in this tenant space without a fire alarm permit. I left a violation notice which I had the installer sign stating that no work is to be continued.
|