ESC04-00011
| Tracking Control | 11/19/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | A | PART |
|
|
Warm spring had been swepth, but secondary entrance into job site off of warm springs had no protection. 11/22/2004 1:54:04 PM
|
ESC04-00011
| Tracking Control | 11/19/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | PART |
|
|
FOLLOW UP: Informed rp to either barricade secondary entrance or install adequate construction entrance. 11/22/2004 1:54:54 PM
|
ESC04-00594
| BMP Violation | 11/22/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | PART |
|
|
Addressed concerns with rp regarding workers parking around site on bare dirt. When rain or snow occurrs trackout will be excessive if this continues. RP will address problem. 11/22/2004 2:19:25 PM
|
ESC04-00753
| Tracking Control | 11/22/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | PART |
|
|
Correction to RP supervisor, need sign posted, additional gravel at job trailer for parking. 11/22/2004 1:49:01 PM
|
ESC04-00753
| Tracking Control | 11/22/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | CANC |
|
|
|
ESC03-01032
| Conference | 11/22/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | PASS |
|
|
|
ESC04-01329
| BMP Violation | 11/22/2004 | 11/22/2004 | 11/22/2004 12:00:00 AM | P | FAIL |
|
|
Correction to rp--need drop inlet protection around internal d.i which discharges into evaporation pond on south side of project. Will follow up. 11/22/2004 3:42:24 PM
|