ELE06-03089
| Electrical Rough-In | 11/22/2006 | 11/22/2006 | 11/22/2006 4:17:53 PM | P | PASS |
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith u/g ok to cover, gec ok, review what needed for ri
|
ELE06-03920
| Electrical Rough-In | 11/22/2006 | 11/22/2006 | 11/22/2006 3:55:52 PM | P | PASS |
|
|
paul Note: kitchen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles east side, kitchen and den area ok to cover
|
ELE06-04308
| Electrical Rough-In | 11/22/2006 | 11/22/2006 | 11/22/2006 2:35:47 PM | P | PASS |
|
|
daryl - call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith walls and hard lids only ok to cover
|
ELE06-03378
| Final | 11/21/2006 | 11/22/2006 | 11/22/2006 2:24:09 PM | P | PASS |
|
|
Final - questions pls call Mike w/Doherty @ ###-####. Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer corr made, ok to final, signed card
|
ELE06-03185
| Permanent Service | 11/22/2006 | 11/22/2006 | 11/22/2006 2:20:19 PM | P | PASS |
|
|
we are ready for a reinspection for perm. service. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH corr made, p/s u/g n ok
|
ELE06-04359
| Final | 11/22/2006 | 11/22/2006 | 11/22/2006 1:17:16 PM | P | PASS |
|
|
questions pls call Mike w/Doherty @ ###-####. Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer t/s ok to final, see t/s
|
ELE06-04359
| Temporary Service | 11/22/2006 | 11/22/2006 | 11/22/2006 1:16:40 PM | P | PASS |
|
|
questions pls call Mike w/Doherty @ ###-####. Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer corr made, t/s o/h n ok
|
ELE06-03814
| Final | 11/21/2006 | 11/22/2006 | 11/22/2006 10:54:24 AM | A | PASS |
|
|
KEVIN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
|
ELE06-00628
| Final | 11/22/2006 | 11/22/2006 | 11/22/2006 10:39:18 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot ok to final
|
ELE05-04498
| Final | 11/22/2006 | 11/22/2006 | 11/22/2006 10:35:55 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot told elect, left corr notice, nec 110.26(A)(1) shall have 36" work depth in front of panels
|
ELE06-04359
| Final | 11/21/2006 | 11/22/2006 | 11/22/2006 9:34:51 AM | A | FAIL |
|
|
temp power insp. questions pls call Mike w/Doherty @ ###-####. Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer called, left corr notice, nec 230.74 service disc shall disconnect all ungrounded conductors simultaneously,312.5 shall provide abrasion protection for all conductors entering enclosure, 250.53(G) electrode shall be flush with or below ground, 408.4 circuit directory shall be correct, BCC job id sticker shall be posted
|
ELE06-03704
| Permanent Service | 11/21/2006 | 11/22/2006 | 11/22/2006 9:30:51 AM | A | PASS |
|
|
insp for street lights. Questions pls call Mike w/Doherty @ ###-####. Scheduled by Heatherw/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer p/s u/g n ok
|
ELE06-03360
| Electrical Rough-In | 11/21/2006 | 11/22/2006 | 11/22/2006 9:05:05 AM | A | PASS |
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover ceilings
|
ELE06-03529
| Electrical Rough-In | 11/21/2006 | 11/22/2006 | 11/22/2006 8:46:25 AM | A | PASS |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith walls and hard lids only ok to cover
|
ELE05-02003
| Final | 11/21/2006 | 11/22/2006 | 11/22/2006 8:06:41 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 1:29:29 PM. 3rd fl anop ok to final
|
ELE06-04110
| Electrical Rough-In | 11/21/2006 | 11/22/2006 | 11/21/2006 4:34:10 PM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|