Inspections for the day of: Wednesday, November 22, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02381 FIRE-Final Inspection11/22/200611/22/200611/22/2006 4:03:02 PMPPASS
Fire life safety final inspection passed.
BLD06-02380 FIRE-Final Inspection11/22/200611/22/200611/22/2006 4:02:28 PMPPASS
Fire life safety finaled.
FIR06-00826 INSP-Final Inspection11/22/200611/22/200611/22/2006 4:02:04 PMPPASS
Fire alarm work is acceptable, permit finaled.
FIR06-00854 INSP-Final Inspection11/22/200611/22/200611/22/2006 4:01:27 PMPPASS
Fire alarm passed final inspection.
FIR06-00420 INSP-Final Inspection11/22/200611/22/200611/22/2006 4:00:53 PMPPASS
Fire alarm finaled.
FIR06-00639 INSP-Sprinkler Rough-in/Hydro11/21/200611/22/200611/22/2006 2:04:16 PMAPART
1st floor hydro test okay.
FIR06-00660 INSP-Sprinkler Rough-in11/22/200611/22/200611/22/2006 1:46:36 PMPFAIL
Need to provide some missing items at the riser including flexible couplings at the top and bottom, psi relief valve per review notes due to grid system, the automatic ball drip for the FDC needs to be relocated to the lowest point for proper operation. The overhead sprinkler rough-in installation is satisfactory.
FIR06-00595 INSP-Alarm Testing11/21/200611/22/200611/22/2006 1:37:05 PMAPART
Re-inspection for the NW quad to verify required corrections completed satisfactory.
FIR06-00540 INSP-Sprinkler Rough-in/Hydro11/20/200611/22/200611/22/2006 1:35:56 PMAPART
OH rough-in for the 2nd floor SW quad is good for cover. The hydrostatic test for this portion of the 2nd floor also passed inspection as noted on approved plans.
FIR06-00420 INSP-Alarm Testing11/20/200611/22/200611/22/2006 1:33:25 PMAPASS
FA work passed field inspection.
BLD06-00448 FIRE-Final Inspection11/21/200611/22/200611/22/2006 10:04:44 AMAPASS
Building 5 life safety passed, the adjacent hydrant on the north side of the building to be rotated 45 deg. as discussed for proper access prior to final for building 4.
MIS06-00303 FIR-Final11/21/200611/22/200611/22/2006 9:34:25 AMAPASS
Items on previous c/n have been verified for completion, life safety inspection passed.
FIR06-00919 INSP-Final Inspection11/21/200611/22/200611/22/2006 9:33:25 AMAPASS
Fire sprinkler work completed satisfactory, permit finaled.
BLD06-03035 FIRE-Final Inspection11/21/200611/22/200611/22/2006 8:47:14 AMAPASS
Required corrections are complete, fire life safety inspection passed.
FIR06-00629 INSP-Sprinkler Rough-in/Hydro11/21/200611/22/200611/22/2006 8:43:37 AMAPART
Completed main tie-in, branch line tie-ins, final pending completion of the ceiling at one location and final walk through of cleanroom/plemum areas.
FIR06-00145 FIR-Aging Inspection11/22/200611/22/200611/22/2006 8:35:48 AM DONE
Project not complete, wip.