BLD06-02381
| FIRE-Final Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 4:03:02 PM | P | PASS |
|
|
Fire life safety final inspection passed.
|
BLD06-02380
| FIRE-Final Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 4:02:28 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR06-00826
| INSP-Final Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 4:02:04 PM | P | PASS |
|
|
Fire alarm work is acceptable, permit finaled.
|
FIR06-00854
| INSP-Final Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 4:01:27 PM | P | PASS |
|
|
Fire alarm passed final inspection.
|
FIR06-00420
| INSP-Final Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 4:00:53 PM | P | PASS |
|
|
Fire alarm finaled.
|
FIR06-00639
| INSP-Sprinkler Rough-in/Hydro | 11/21/2006 | 11/22/2006 | 11/22/2006 2:04:16 PM | A | PART |
|
|
1st floor hydro test okay.
|
FIR06-00660
| INSP-Sprinkler Rough-in | 11/22/2006 | 11/22/2006 | 11/22/2006 1:46:36 PM | P | FAIL |
|
|
Need to provide some missing items at the riser including flexible couplings at the top and bottom, psi relief valve per review notes due to grid system, the automatic ball drip for the FDC needs to be relocated to the lowest point for proper operation. The overhead sprinkler rough-in installation is satisfactory.
|
FIR06-00595
| INSP-Alarm Testing | 11/21/2006 | 11/22/2006 | 11/22/2006 1:37:05 PM | A | PART |
|
|
Re-inspection for the NW quad to verify required corrections completed satisfactory.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 11/20/2006 | 11/22/2006 | 11/22/2006 1:35:56 PM | A | PART |
|
|
OH rough-in for the 2nd floor SW quad is good for cover. The hydrostatic test for this portion of the 2nd floor also passed inspection as noted on approved plans.
|
FIR06-00420
| INSP-Alarm Testing | 11/20/2006 | 11/22/2006 | 11/22/2006 1:33:25 PM | A | PASS |
|
|
FA work passed field inspection.
|
BLD06-00448
| FIRE-Final Inspection | 11/21/2006 | 11/22/2006 | 11/22/2006 10:04:44 AM | A | PASS |
|
|
Building 5 life safety passed, the adjacent hydrant on the north side of the building to be rotated 45 deg. as discussed for proper access prior to final for building 4.
|
MIS06-00303
| FIR-Final | 11/21/2006 | 11/22/2006 | 11/22/2006 9:34:25 AM | A | PASS |
|
|
Items on previous c/n have been verified for completion, life safety inspection passed.
|
FIR06-00919
| INSP-Final Inspection | 11/21/2006 | 11/22/2006 | 11/22/2006 9:33:25 AM | A | PASS |
|
|
Fire sprinkler work completed satisfactory, permit finaled.
|
BLD06-03035
| FIRE-Final Inspection | 11/21/2006 | 11/22/2006 | 11/22/2006 8:47:14 AM | A | PASS |
|
|
Required corrections are complete, fire life safety inspection passed.
|
FIR06-00629
| INSP-Sprinkler Rough-in/Hydro | 11/21/2006 | 11/22/2006 | 11/22/2006 8:43:37 AM | A | PART |
|
|
Completed main tie-in, branch line tie-ins, final pending completion of the ceiling at one location and final walk through of cleanroom/plemum areas.
|
FIR06-00145
| FIR-Aging Inspection | 11/22/2006 | 11/22/2006 | 11/22/2006 8:35:48 AM | | DONE |
|
|
Project not complete, wip.
|