BLD11-00308
| FIRE-Final Inspection | 11/22/2011 | 11/22/2011 | 11/23/2011 4:30:08 PM | P | PASS |
|
|
|
BLD11-02163
| FIRE-Final Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 5:01:24 PM | P | PASS |
|
|
C/N items finished with the exception of door hardware at the mercantile area west side exit. Tenant to provide single action hardware as discussed prior to structural final.
|
BLD10-00831
| FIRE-Final Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 4:57:50 PM | P | PASS |
|
|
Noted correction items verified for completion. Fire life safety finaled.
|
BLD11-01041
| FIRE-Final Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 4:56:07 PM | P | NH |
|
|
|
FIR11-00619
| INSP-Sprinkler Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 4:55:48 PM | P | PART |
|
|
Overhead work at the remodel area approved for ceiling cover.
|
BLD11-02559
| FIRE-Final Inspection | 11/21/2011 | 11/22/2011 | 11/22/2011 4:54:00 PM | P | PASS |
|
|
Door hardware at one location corrected while on site. Fire life safety finaled.
|
FIR11-00625
| INSP-Final Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 4:20:18 PM | P | PASS |
|
|
Fire alarm permit work passed inspection.
|
FIR10-00329
| FIR-Aging Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 1:37:05 PM | | FAIL |
|
|
No call for insp.
|
BLD11-01869
| FIRE-Conference | 11/22/2011 | 11/22/2011 | 11/22/2011 1:36:00 PM | A | DONE |
|
|
Site visit to confirm project status. Related fire sprinkler permit work and fire life safety inspections needed prior to final.
|
BLD11-02323
| FIRE-Sprinkler Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 1:29:33 PM | A | NH |
|
|
|
FIR11-00591
| INSP-Sprinkler Rough-in/Hydro | 11/22/2011 | 11/22/2011 | 11/22/2011 1:28:34 PM | A | PART |
|
|
Overhead cover approved.
|
FIR07-00817
| FIR-Aging Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 8:11:44 AM | | DONE |
|
|
Building 1 construction suspended.
|
FIR10-00325
| FIR-Aging Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 8:08:30 AM | | FAIL |
|
|
|
FIR10-00213
| FIR-Aging Inspection | 11/22/2011 | 11/22/2011 | 11/22/2011 8:07:28 AM | | PART |
|
|
Final pending tamper switch at the PIV.
|