Inspections for the day of: Tuesday, November 22, 2011.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02165 FIRE-Conference11/15/201111/15/2011 P 
BLD11-02748 FIRE-Conference11/22/201111/22/201111/22/2011 3:05:12 PMPDONE
Testing of the smoke evac system passed.
BLD11-01649 FIRE-Final Inspection11/22/201111/22/201111/22/2011 3:02:33 PMPPASS
life safety passed.
FIR11-00600 INSP-Sprinkler Rough-in11/22/201111/22/201111/22/2011 1:55:15 PMPPASS
Sprinkler piping can be covered.
FIR11-00609 INSP-Final Inspection11/22/201111/22/201111/22/2011 1:54:45 PMPFAIL
Project can be finaled when the ceiling tile has been installed.
BLD11-02815 FIRE-Final Inspection11/21/201111/22/201111/22/2011 12:49:49 PMPPASS
life safety passed
FIR11-00547 INSP-Final Inspection11/21/201111/22/201111/22/2011 11:33:38 AMAPASS
Permit finaled
BLD11-01884 FIRE-Final Inspection11/21/201111/22/201111/22/2011 8:04:17 AMAFAIL
Provide emergency lighting as discussed.
BLD10-02929 FIRE-Final Inspection11/22/201111/22/201111/22/2011 8:03:39 AMAPASS
Life safety passed