FIR13-00341
| INSP-Supply line flush | 11/21/2013 | 11/22/2013 | 11/22/2013 3:51:11 PM | P | CANC |
|
|
Cancel per James
|
FIR13-00402
| INSP-Sprinkler Rough-in | 11/22/2013 | 11/22/2013 | 11/22/2013 3:50:25 PM | P | PASS |
|
|
Overhead rough-in passed. Still need tenting inspection, heat tape inspection and the dry sidewalls for the second and third floors
|
BLD13-03276
| FIRE-Final Inspection | 11/22/2013 | 11/22/2013 | 11/22/2013 3:04:15 PM | P | PASS |
|
|
Life safety passed. Could not contact plan reviewer to verify the emergency lighting was indeed not required.
|
BLD13-03208
| FIRE-Final Inspection | 11/22/2013 | 11/22/2013 | 11/22/2013 3:01:58 PM | P | FAIL |
|
|
Provide exit signs and single action hardware on the exit doors as discussed.
|
FIR13-00307
| INSP-Final Inspection | 11/22/2013 | 11/22/2013 | 11/22/2013 1:36:45 PM | P | PASS |
|
|
Permit finaled
|
BLD13-02401
| FIRE-Final Inspection | 11/20/2013 | 11/22/2013 | 11/22/2013 1:15:33 PM | A | PART |
|
|
A temporary occupancy is being given with Romeo Gervais permission until the remaining sprinkler work is complete for the HC Company tenant.
|
FIR13-00263
| INSP-Supply line flush | 11/21/2013 | 11/22/2013 | 11/22/2013 10:38:53 AM | A | PASS |
|
|
underground flush passed
|
FIR13-00531
| INSP-Final Inspection | 11/21/2013 | 11/22/2013 | 11/22/2013 10:11:11 AM | A | PASS |
|
|
permit finaled
|