Inspections for the day of: Friday, November 22, 2013.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00341 INSP-Supply line flush11/21/201311/22/201311/22/2013 3:51:11 PMPCANC
Cancel per James
FIR13-00402 INSP-Sprinkler Rough-in11/22/201311/22/201311/22/2013 3:50:25 PMPPASS
Overhead rough-in passed. Still need tenting inspection, heat tape inspection and the dry sidewalls for the second and third floors
BLD13-03276 FIRE-Final Inspection11/22/201311/22/201311/22/2013 3:04:15 PMPPASS
Life safety passed. Could not contact plan reviewer to verify the emergency lighting was indeed not required.
BLD13-03208 FIRE-Final Inspection11/22/201311/22/201311/22/2013 3:01:58 PMPFAIL
Provide exit signs and single action hardware on the exit doors as discussed.
FIR13-00307 INSP-Final Inspection11/22/201311/22/201311/22/2013 1:36:45 PMPPASS
Permit finaled
BLD13-02401 FIRE-Final Inspection11/20/201311/22/201311/22/2013 1:15:33 PMAPART
A temporary occupancy is being given with Romeo Gervais permission until the remaining sprinkler work is complete for the HC Company tenant.
FIR13-00263 INSP-Supply line flush11/21/201311/22/201311/22/2013 10:38:53 AMAPASS
underground flush passed
FIR13-00531 INSP-Final Inspection11/21/201311/22/201311/22/2013 10:11:11 AMAPASS
permit finaled