Inspections for the day of: Friday, November 22, 2013.
Number of inspections: 6
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-02674 BLD-Final11/20/201311/22/201311/22/2013 2:04:09 PMPPART
Wes Manz Phone #: ###-####. Ok for temp occ. Needs to install grab bars, mirrors and provide ada compliant dorr hardware on mens restroom.
BLD13-02159 BLD-Final11/21/201311/22/201311/22/2013 1:15:48 PMPNR
Please call Matt about 30 minutes before you get to the mall. Thanks Phone #: ###-#### >> Inspection requested via web by Matt Perry. Needs fire/life/safety.
GCB13-00157 GCB-Fire Wall11/21/201311/22/201311/22/2013 12:00:52 PMADONE
Mary Pat ###-#### call first. On site to verify the construction of a fire rated wall between dwelling units at the above location. Inspection was conducted in the attic at the dwelling unit seperation. I was able to visually verify the 4ft. laydown parapet and rated wall construction to the underneath side of the parapet. Per the home owner, construction documents indicate the two 1 hour walls were constructed. The in place construction at the attic is consistant with the approved construction documents. It is in my opinion that the in place firewall is constructed as per the construction documents. No destructive inspections were conducted.
BLD13-01910 BLD-Final11/21/201311/22/201311/22/2013 10:31:33 AMANR
Brian Phone #: ###-####. Needs fire/life/safety, public works and zoning finals.
BLD13-02226 BLD-Wall Bracing11/21/201311/22/201311/22/2013 10:30:48 AMAPASS
randy Phone #: ###-####. Roof diadpragm and exterior walls on addition ok to cover.
BLD13-00879 BLD-Final11/20/201311/22/2013 A 
JOEY Phone #: ###-####