Inspections for the day of: Tuesday, November 23, 1999.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02948 BLD-Framing/Rough-in11/22/199911/23/199911/23/1999 12:00:00 AMAPART
PJ ###-#### Ok to side.
BLD99-02247 BLD-Framing/Rough-in11/23/199911/23/199911/23/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/23/1999 at 06:09:18. Contact: . C/N.. Supply prev. corr. Notice and plans.
BLD99-02390 BLD-Framing/Rough-in11/23/199911/23/199911/23/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/23/1999 at 06:11:17. Contact: . Shear wall ok.
BLD99-02318 BLD-Final11/23/199911/23/199911/23/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/23/1999 at 07:09:32. Contact: ###-####. L.C. issued.
BLD99-02891 BLD-Framing/Rough-in11/22/199911/23/199911/23/1999 12:00:00 AMAFAIL
Ammon ###-#### C/N.. Nail brace panels per eng. Missed straps.
BLD99-02601 BLD-Final11/22/199911/23/199911/23/1999 12:00:00 AMAPASS
LARRY ###-#### L.C. issued.
BLD99-03165 BLD-Framing/Rough-in11/22/199911/23/199911/23/1999 12:00:00 AMAPART
greg ###-#### partial Ok to cover all but interior partitions walls.
BLD99-02935 BLD-Framing/Rough-in11/22/199911/23/199911/23/1999 12:00:00 AMAPART
shear wall todd ###-#### Shear wall ok.
BLD99-02133 BLD-Final11/22/199911/23/199911/23/1999 12:00:00 AMAPASS
KEY ABOVE FRONT DOOR MARK ###-#### C/C #16266.
BLD99-03024 BLD-Energy code compliance11/22/199911/23/199911/23/1999 12:00:00 AMAFAIL
###-#### Add, int. shear nail retro.
BLD99-03448 BLD-Foundation11/22/199911/23/199911/23/1999 12:00:00 AMAPART
###-#### wall Ok except cut out for truck.
BLD99-03213 BLD-Framing/Rough-in11/22/199911/23/199911/23/1999 12:00:00 AMPPASS
###-####
BLD99-02205 BLD-Final11/23/199911/23/199911/23/1999 12:00:00 AMPFAIL
wes ###-#### fn occ C/N.. Need final letter from sp. Insp. Agency, need all req. signatures.
BLD99-02880 BLD-Energy code compliance11/23/199911/23/199911/23/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/23/1999 at 08:22:06. Contact: ###-####.
BLD99-01796 BLD-Final11/23/199911/23/199911/23/1999 12:00:00 AMPPASS
russell ###-#### C/C #16268.
BLD99-01825 BLD-Final11/23/199911/23/199911/23/1999 12:00:00 AMPPASS
russ ###-#### C/C #16267.
BLD99-02298 BLD-Final11/23/199911/23/199911/23/1999 12:00:00 AMPFAIL
russ ###-#### C/N.. Protection post.
BLD99-03447 BLD-Footing11/23/199911/23/199911/23/1999 12:00:00 AMPFAIL
jerry ###-#### Soil & settbacks appear ok, no approved plans.
MEC99-02340 Final11/22/199911/23/199911/22/1999 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 11/22/1999 at 16:12:43. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/22/1999 at 16:15:02.