BLD01-02197
| BLD-Framing/Rough-in | 11/21/2001 | 11/23/2001 | 11/23/2001 12:00:00 AM | A | FAIL |
|
|
C/n prior c/n items not completed--do not insulate. 11/23/2001 9:50:27 AM
|
BLD01-02376
| BLD-Wall cover | 11/21/2001 | 11/23/2001 | 11/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 14:57:15. Contact: . ok to cover except area at rear of house where the retrofitted hold down needs to be installed. 11/23/2001 9:35:20 AM
|
BLD01-02794
| BLD-Framing/Rough-in | 11/23/2001 | 11/23/2001 | 11/23/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/23/2001 at 10:16:30. Contact: ###-####. shear-ok to side 11/23/2001 12:51:40 PM
|
BLD01-02197
| BLD-Framing/Rough-in | 11/23/2001 | 11/23/2001 | 11/23/2001 12:00:00 AM | P | PASS |
|
|
dan ###-#### ok to insulate. 11/23/2001 1:11:33 PM
|