ELE03-04062
| Electrical Rough-In | 11/22/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | A | FAIL |
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
Add required receps.
install electrode .
clearance for panel.
free conductor, protection of cable, box fill, and outer sheath into box.
broken clamps.
250.148
#14 wire in 20a circuit
must uncover coverec area. 11/23/2004 10:06:41 AM
|
ELE04-02674
| Electrical Rough-In | 11/22/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | A | FAIL |
|
|
Verna-this is the bonding for motor for parts & swiming pool; Phone #: ###-#### Internet Inspection Request from: Jan Rice
bonding lugs shall be copper or brass 11/23/2004 8:52:31 AM
|
ELE04-03663
| Rough-In Permanent Service | 11/22/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | A | PASS |
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
P/S O/h N Ok 11/23/2004 10:14:13 AM
|
ELE04-03679
| Conference | 11/22/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | A | PART |
|
|
tom 250- 7238
bathroom 11/23/2004 10:45:26 AM
|
ELE04-03602
| Electrical Rough-In | 11/22/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/22/2004 at 4:02:24 PM. Contact: ###-####.
|
ELE04-03073
| Permanent Service | 11/23/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | P | PASS |
|
|
###-####
P/S U/g N OK 11/23/2004 2:37:25 PM
|
ELE04-02074
| Conference | 11/23/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | P | PART |
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
had conf 11/23/2004 1:42:47 PM
|
ELE04-03416
| Rough-In Permanent Service | 11/23/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | P | PASS |
|
|
###-####. Scheduled by a contractor via Hello! on 11/23/2004 at 10:50:47 AM. Contact: ###-####. 11/23/2004 11:52:53 AM
P/S O/H n Ok
R/i Ok 11/23/2004 3:40:37 PM
|
ELE04-02674
| Electrical Rough-In | 11/23/2004 | 11/23/2004 | 11/23/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|