GCM11-00194
| GCM-Pressure Test | 11/22/2011 | 11/23/2011 | 11/23/2011 10:31:06 AM | A | PART |
|
|
Travis @ ###-#### pt on most of the units ok, will retest the southern most unit and the 4th unit from the south along with two units in service that will need to be scheduled for a shutdown for testing. center section north of D&B to restaurant.
|