BLD11-02607
| FIRE-Conference | 11/23/2011 | 11/23/2011 | 11/23/2011 4:32:18 PM | P | PART |
|
|
Contact Doug regarding building fire alarm
|
FIR11-00301
| INSP-Sprinkler Rough-in/Hydro | 11/22/2011 | 11/23/2011 | 11/23/2011 4:29:36 PM | P | NR |
|
|
Please contact Jeremiah prior to arrival. Phone #: ###-#### >> Inspection requested via web by Alicia Pauley NOTE: **Area requested for inspection is not included in the scope of this permit (FIR11-00301 covers system 8 sub-fab). Contractor intended an overhead inspection for system 4 photo bay for which permit FIR11-00524 is not yet approved or issued at this time. Noted system 4 mains and branchlines already installed. No inspection performed due to permit status and lack of approved drawings.**
|
FIR11-00496
| INSP-Sprinkler Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 4:08:17 PM | A | PART |
|
|
Verified retainers at beam clamps in the parking garage, rough-in at units 101 thru 108 first floor okayed. See dated plan annotations.
|
FIR11-00528
| INSP-Conference | 11/23/2011 | 11/23/2011 | 11/23/2011 1:54:52 PM | A | DONE |
|
|
On site meeting with contractor and mechanical inspectors regarding missing smoke detection at existing air handler units and conditions per IMC 2009 sec. 606.
|
FIR11-00627
| INSP-Sprinkler Rough-in | 11/23/2011 | 11/23/2011 | 11/23/2011 12:00:00 AM | P | CANC |
|
|
ken Phone #: ###-####
|
FIR11-00627
| INSP-Final Inspection | 11/23/2011 | 11/23/2011 | 11/23/2011 12:00:00 AM | P | CANC |
|
|
ken Phone #: ###-####
|