BLD11-02748
| FIRE-Final Inspection | 11/22/2011 | 11/23/2011 | 11/23/2011 3:36:26 PM | A | PASS |
|
|
life safety passed.
|
FIR11-00606
| INSP-Sprinkler Rough-in | 11/23/2011 | 11/23/2011 | 11/23/2011 2:43:36 PM | P | PASS |
|
|
Rough-in passed
|
FIR11-00464
| INSP-Sprinkler Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 2:40:59 PM | P | PASS |
|
|
Installation appears ok and matches the as-built plans that are going to be resubmitted for review. However the flat faced bushing still has not been replaced.
|
FIR11-00589
| INSP-Final Inspection | 11/23/2011 | 11/23/2011 | 11/23/2011 2:06:24 PM | P | PASS |
|
|
permit finaled
|
BLD11-02645
| FIRE-Final Inspection | 11/23/2011 | 11/23/2011 | 11/23/2011 2:05:36 PM | P | PASS |
|
|
life safety passed.
|
FIR11-00623
| INSP-Final Inspection | 11/23/2011 | 11/23/2011 | 11/23/2011 2:05:06 PM | P | PASS |
|
|
Permit finaled
|
FIR11-00606
| INSP-Sprinkler Rough-in | 11/23/2011 | 11/23/2011 | 11/23/2011 9:10:02 AM | A | PASS |
|
|
Piping above the layin ceiling tile is ok to cover
|
FIR11-00623
| INSP-Sprinkler Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 8:52:06 AM | A | PASS |
|
|
The overhead sprinkler piping is ok to cover.
|
BLD11-01884
| FIRE-Final Inspection | 11/22/2011 | 11/23/2011 | 11/23/2011 8:47:38 AM | A | PASS |
|
|
life safety passed
|