MIS12-00320
| BLD-Conference | 11/23/2012 | 11/23/2012 | 11/24/2012 12:13:50 PM | P | DONE |
|
|
Arrived at jobsite....No equipment, bldg. materials or workers on site. Roof complaint??
|
BLD12-02977
| BLD-Final | 11/19/2012 | 11/23/2012 | 11/24/2012 12:11:00 PM | P | NR |
|
|
Ernest Phone #: ###-#### Complete fire corrections, get final approval from fire, then call for structural final.
|
BLD12-01291
| BLD-Other | 11/21/2012 | 11/23/2012 | 11/23/2012 11:15:57 AM | A | DONE |
|
|
not sure what type of inspection want?? Needs to be advised as to what inspections needed because project was started several years ago//Daryl Thomas Phone #: ###-#### Met with homeowner. Need to obtain Electrical permit and call for Electrical rough in inspection, prior to calling for a framing inspection.
|
MIS12-00320
| BLD-Conference | 11/23/2012 | 11/23/2012 | 11/23/2012 11:13:37 AM | A | CANC |
|
|
|
BLD12-01909
| BLD-Framing/Rough-in | 11/21/2012 | 11/23/2012 | 11/23/2012 11:12:20 AM | A | NR |
|
|
SHear inspection-Pat Phone #: ###-#### C/N .....Contractor to acertain that shear insp is ready before calling. Missed nailing, blocking, straps, Etc.
|
BLD12-00950
| DOC - Permit Finaled | 11/23/2012 | 11/23/2012 | 11/23/2012 8:53:02 AM | P | PASS |
|
|
|