Inspections for the day of: Friday, November 23, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00265 INSP-Final Inspection11/23/201211/23/201211/23/2012 4:44:32 PMPPASS
Fire alarm permit final approved.
FIR12-00140 INSP-Final Inspection11/23/201211/23/201211/23/2012 2:33:04 PMPPASS
Fire alarm permit finaled. Inspection passed.
FIR12-00672 INSP-Final Inspection11/23/201211/23/201211/23/2012 2:28:38 PMPPASS
Inspection passed. Fire sprinkler permit finaled.
BLD12-02129 FIRE-Final Inspection11/23/201211/23/201211/23/2012 2:25:24 PMAPASS
Fire life safety finaled.
FIR12-00578 INSP-Final Inspection11/23/201211/23/201211/23/2012 2:24:49 PMAPASS
Fire sprinkler permit finaled.
FIR12-00446 FIR-Aging Inspection11/23/201211/23/201211/23/2012 11:39:28 AM PEND
Project related BLD permit pending issued status.
BLD12-00308 FIRE-Final Inspection11/21/201211/23/201211/23/2012 11:37:21 AMAPASS
Scope of permit work completed. Inspection passed.
BLD12-02977 FIRE-Final Inspection11/19/201211/23/201211/23/2012 11:36:20 AMAFAIL
Correction items include; provide approved hardware at both east side exit doors, remove hasp and padlock at the SE exit door, post two fire extinguishers as discussed, provide verification the existing fire sprinkler system is current with an annual certification.