BLD15-03223
| FIRE-Final Inspection | 11/23/2015 | 11/23/2015 | 11/24/2015 2:40:42 PM | P | FAIL |
|
|
Not ready for a final due to the fire sprinkler permit in the review status and no fire alarm permit even submitted yet. I did go over emergency light requierments with the electrician.
|
FIR15-00718
| INSP-Sprinkler Rough-in/Hydro | 11/23/2015 | 11/23/2015 | 11/23/2015 2:51:06 PM | P | PASS |
|
|
Overhead hydro tests passed
|
FIR15-00697
| INSP-Sprinkler Rough-in | 11/17/2015 | 11/23/2015 | 11/23/2015 2:39:24 PM | P | PART |
|
|
Sprinkler piping is ok to cover except the two pendant heads at the soffit on the east side of the building. These two pendants are still located above the new ceiling grid so they still need to be modified to provide adequate coverage.
|
BLD14-03300
| FIRE-Final Inspection | 11/22/2015 | 11/23/2015 | 11/23/2015 1:34:25 PM | P | PASS |
|
|
life safety passed
|
FIR15-00740
| INSP-Final Inspection | 11/20/2015 | 11/23/2015 | 11/23/2015 1:33:27 PM | A | PASS |
|
|
Permit finaled
|
FIR15-00303
| INSP-Final Inspection | 11/23/2015 | 11/23/2015 | 11/23/2015 12:30:05 PM | P | PASS |
|
|
Permit finaled
|
BLD15-04059
| FIRE-Final Inspection | 11/20/2015 | 11/23/2015 | 11/23/2015 9:20:17 AM | A | PASS |
|
|
Life safety passed. Tim and I discussed him getting an updated plan to plan review prior to a building inspection showing the minor wall differences at the Reception Area.
|