ELE18-04481
| Final | 11/23/2018 | 11/23/2018 | 11/23/2018 12:26:46 PM | P | NH |
|
|
Inspection requested via web by Same Electric Space locked, no answer at door, no contact information, left card.
|
ELE18-04495
| Electrical Rough-In | 11/23/2018 | 11/23/2018 | 11/23/2018 12:07:37 PM | P | PASS |
|
|
Please do rough-in inspection for remodeled circuits for walls and ceiling spaces. Phone #: ###-#### Inspection requested via web by Kevin Perez 1 open box above grid for electrical in column not built yet. Rest of walls and grid rough in ok cover.
|
ELE18-04421
| Electrical Rough-In | 11/20/2018 | 11/23/2018 | 11/23/2018 10:21:59 AM | A | PASS |
|
|
Fred Phone #: ###-#### Shall bond metal box behind range and provide breaker blank for outdoor panel. Rough in ok.
|
ELE18-03332
| Final | 11/21/2018 | 11/23/2018 | 11/23/2018 9:47:29 AM | A | PASS |
|
|
Ron Phone #: ###-#### Pavers to be installed over walkway. Final ok
|
ELE18-04494
| Electrical Rough-In | 11/22/2018 | 11/23/2018 | 11/23/2018 9:10:42 AM | A | PASS |
|
|
Walls Only Phone #: ###-#### Inspection requested via web by Kevin Burke Wall rough in ok cover
|