Inspections for the day of: Wednesday, November 24, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-03973 Final11/23/199911/24/199911/24/1999 12:00:00 AMAPASS
SHAWNA ###-####
MEC98-03394 Final11/23/199911/24/199911/24/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/23/1999 at 14:24:34. Contact: ###-####. Corrections.
MEC99-03970 Rough-in11/23/199911/24/199911/24/1999 12:00:00 AMAFAIL
###-#### Conference.
MEC99-02145 Final11/24/199911/24/199911/24/1999 12:00:00 AMPFAIL
as per dixxxxiiiieeee Done by 350.
MEC99-00998 Final11/24/199911/24/199911/24/1999 12:00:00 AMPFAIL
janet 345- 4115 code is 2222 done by 350.
MEC99-03951 Rough-in11/24/199911/24/199911/24/1999 12:00:00 AMPPASS
as per dixie R/I final ok.
MEC99-03968 Final11/24/199911/24/199911/24/1999 12:00:00 AMPPASS
chit
MEC99-03906 Pressure Test11/24/199911/24/199911/24/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/24/1999 at 09:42:46. Contact: ###-####. Gas ok.
MEC99-03906 Final11/24/199911/24/199911/24/1999 12:00:00 AMPFAIL
this is also for a furance ###-#### Need specs on wall furnace.
MEC99-03236 Pressure Test11/24/199911/24/199911/24/1999 12:00:00 AMPFAIL
Have a good day DB ###-#### Gas fail.
MEC99-03970 Rough-in11/24/199911/24/199911/24/1999 12:00:00 AMPFAIL
late pm ###-#### never showed for.