MEC00-03876
| Final | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | FAIL |
|
|
Verna Richter ###-#### f/p only
c/ n posted on vent pipe bracing 11/24/2000 9:07:39 AM
|
BLD00-02674
| BLD-Framing/Rough-in | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | CANC |
|
|
FR ROB-- ###-#### SHEAR PANEL
canc. per contractor 11/24/2000 9:11:08 AM
|
BLD00-02829
| BLD-Framing/Rough-in | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PART |
|
|
###-####
c/n posted, shear inspection, ok to side unaffected areas 11/24/2000 11:05:54 AM
|
BLD00-01864
| BLD-Framing/Rough-in | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 12:21:21. Contact: ###-####.
need sprinklers signed off, then ok to cover 11/24/2000 10:40:52 AM
|
MEC00-03245
| Final | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 14:56:56. Contact: ###-####.
wrong address 11/24/2000 9:37:57 AM
|
MEC00-03278
| Final | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 14:58:19. Contact: ###-####.
|
MEC00-03922
| Final | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 15:34:40. Contact: ###-####.
|
MEC00-04090
| Pressure Test | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 15:45:49. Contact: ###-####.
|
MEC00-04090
| Rough-in | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/22/2000 at 15:46:24. Contact: ###-####.
|
MEC00-04028
| Pressure Test | 11/21/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 11:58:33. Contact: ###-####.
2 fireplaces, 25 psi ea. 11/24/2000 11:44:19 AM
|
BLD00-02420
| BLD-Framing/Rough-in | 11/21/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:45:09. Contact: ###-####.
c/n posted, need to verify elec. signoff 11/24/2000 2:22:05 PM
|
BLD00-01720
| BLD-Framing/Rough-in | 11/24/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/24/2000 at 08:03:20. Contact: .
ok to insulate 11/24/2000 12:19:17 PM
|
MEC00-04100
| Final | 11/24/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | P | NH |
|
|
###-####
|
MIS00-00242
| COD-Final | 11/22/2000 | 11/24/2000 | 11/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 415 On 11/22/2000 3:48:39 PM
c/n posted x2, verify elec. sign off 11/24/2000 2:23:32 PM
|