FIR03-00555
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | PASS |
|
|
|
FIR03-00374
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | PASS |
|
|
|
FIR03-00600
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | PASS |
|
|
|
FIR03-00376
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | PASS |
|
|
|
BLD03-00986
| FIRE-Final Inspection | 11/19/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | FAIL |
|
|
Provide fire extinguishers, remove the two exits signs at the locked doors and provide breaker lock on breaker 13 and final fire alarm 11/24/2003 12:25:49 PM
|
BLD03-01206
| FIRE-Final Inspection | 11/21/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | FAIL |
|
|
Provide fire extinguishers and final fire alarm system 11/24/2003 12:26:08 PM
|
FIR03-00279
| INSP-Final Inspection | 11/21/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | PART |
|
|
A temp occupancy was given until adequate batteries are provided for the Nac panel. All other life safety items are ok. Provide 14.4 AH batteries for the facp 11/24/2003 12:31:51 PM
|
FIR03-00508
| INSP-Final Inspection | 11/23/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | A | FAIL |
|
|
Provide a minimum of 20.16 AH batteries for facp and update the map 11/24/2003 12:23:58 PM
|
FIR03-00705
| INSP-Sprinkler Rough-in/Hydro | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/24/2003 at 7:23:08 AM. Contact: ###-####.
|
BLD02-01074
| FIRE-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PASS |
|
|
life safety finaled 11/24/2003 4:33:45 PM
|
BLD03-02301
| FIRE-Final Inspection | 11/21/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PASS |
|
|
Fire life safety and fire spirnklers finaled 11/24/2003 3:02:48 PM
|
FIR03-00661
| INSP-Final Inspection | 11/21/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | FAIL |
|
|
Per the review notes the maximum sprinkler head spacing is 127 sq. ft. The pendant spacing in the east office is at 152 sq. ft. 11/24/2003 1:12:12 PM
|
BLD02-01063
| FIRE-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PART |
|
|
A temp occupancy was given until adequate batteries are provided for the Nac panel. All other life safety items are ok
|
BLD02-02715
| FIRE-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PART |
|
|
A temp occupancy was given until adequate batteries are provided for the Nac panel. All other life safety items are ok
|
FIR03-00270
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PART |
|
|
A temp occupancy was given until adequate batteries are provided for the Nac panel. All other life safety items are ok
|
FIR03-00661
| INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 12:00:00 AM | P | PASS |
|
|
Fire sprinklers finaled
|
FIR03-00705
| INSP-Sprinkler Rough-in/Hydro | 11/21/2003 | 11/24/2003 | 11/21/2003 12:00:00 AM | P | CANC |
|
|
###-#### Mick--cancel per mick
|