Inspections for the day of: Monday, November 24, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00006 FIR-Aging Inspection11/24/200811/24/200811/26/2008 12:49:25 PM NR
Per Darcy the work for this project is in progress.
BLD08-01828 FIRE-Final Inspection11/24/200811/24/200811/24/2008 4:08:33 PMPPASS
life safety passed
FIR08-00601 INSP-Alarm Testing11/21/200811/24/200811/24/2008 4:07:02 PMPFAIL
The smoke detectors have been relocated but I found that the signals are not going out to the monitoring station. The testing of all devices will need to be redone
FIR08-00649 INSP-Sprinkler Rough-in/Hydro11/21/200811/24/200811/24/2008 2:51:18 PMAPART
Above ground hydro tests of system 1, 2, 4 and 6 passed. System 3 and 5 failed. Also per NFPA 20 the suction and discharge on the fire pump needs to be hydro tested. The header and FDC had not been tested yet.
FIR08-00761 INSP-Sprinkler Rough-in/Hydro11/21/200811/24/200811/24/2008 2:49:17 PMAPASS
The hydro test for the sprinkler piping that serves the mezzanine is passed.
FIR07-01051 INSP-Sprinkler Rough-in11/21/200811/24/200811/24/2008 12:43:13 PMAPART
See the city approved plans for hanger locations, with todays date, that are ok to cover. I also did the rough-in inspection for the added sprinkler coverage in the mechanical closets between the restrooms on the first and second floors.
FIR08-00717 INSP-Final Inspection11/20/200811/24/200811/24/2008 11:05:48 AMAFAIL
No approved plans were on site. I agreed to atleast set off the a/v's but found that they were not syn'c. Testing was stopped.