FIR08-00006
| FIR-Aging Inspection | 11/24/2008 | 11/24/2008 | 11/26/2008 12:49:25 PM | | NR |
|
|
Per Darcy the work for this project is in progress.
|
BLD08-01828
| FIRE-Final Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 4:08:33 PM | P | PASS |
|
|
life safety passed
|
FIR08-00601
| INSP-Alarm Testing | 11/21/2008 | 11/24/2008 | 11/24/2008 4:07:02 PM | P | FAIL |
|
|
The smoke detectors have been relocated but I found that the signals are not going out to the monitoring station. The testing of all devices will need to be redone
|
FIR08-00649
| INSP-Sprinkler Rough-in/Hydro | 11/21/2008 | 11/24/2008 | 11/24/2008 2:51:18 PM | A | PART |
|
|
Above ground hydro tests of system 1, 2, 4 and 6 passed. System 3 and 5 failed. Also per NFPA 20 the suction and discharge on the fire pump needs to be hydro tested. The header and FDC had not been tested yet.
|
FIR08-00761
| INSP-Sprinkler Rough-in/Hydro | 11/21/2008 | 11/24/2008 | 11/24/2008 2:49:17 PM | A | PASS |
|
|
The hydro test for the sprinkler piping that serves the mezzanine is passed.
|
FIR07-01051
| INSP-Sprinkler Rough-in | 11/21/2008 | 11/24/2008 | 11/24/2008 12:43:13 PM | A | PART |
|
|
See the city approved plans for hanger locations, with todays date, that are ok to cover. I also did the rough-in inspection for the added sprinkler coverage in the mechanical closets between the restrooms on the first and second floors.
|
FIR08-00717
| INSP-Final Inspection | 11/20/2008 | 11/24/2008 | 11/24/2008 11:05:48 AM | A | FAIL |
|
|
No approved plans were on site. I agreed to atleast set off the a/v's but found that they were not syn'c. Testing was stopped.
|