Inspections for the day of: Monday, November 24, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00513 Random Inspection11/24/200811/24/200811/24/2008 4:30:00 PMPPASS
BLD07-01087 BLD-Energy code compliance11/24/200811/24/200811/24/2008 4:29:48 PMPPASS
joe Phone #: ###-#### - please call 1/2 hr prior
BLD08-02068 BLD-Final11/24/200811/24/200811/24/2008 2:55:49 PMPPASS
jackie - please call 1/2 hr prior Phone #: ###-####
BLD08-02068 DOC - Permit Finaled11/24/200811/24/200811/24/2008 2:52:10 PMPPASS
Letter of completion issued.
ESC08-00951 Random Inspection11/24/200811/24/200811/24/2008 2:03:15 PMPPASS
ESC permit sign posted. Site was clean. BMP's ok.
BLD08-02324 BLD-Framing/Rough-in11/24/200811/24/200811/24/2008 2:02:41 PMPPASS
tim Phone #: ###-####
BLD08-01790 BLD-Final11/20/200811/24/200811/24/2008 11:21:50 AMANR
chad Phone #: ###-####. Needs life/safety final first. Contacted Chad at number provided and left message.
ESC08-00927 Site Preparation11/24/200811/24/200811/24/2008 10:38:59 AMAPART
ESC permit sign posted. All BMP's in place. Conc. washout area has been established. Spoke with RP about extending the silt fence on the NW portion of job site to contain remaining excavated soils and to complete the deleniation of the property.
BLD08-02280 BLD-Footing11/21/200811/24/200811/24/2008 10:36:44 AMAPART
bob Phone #: ###-####. Exterior and interior footings.
BLD08-02407 BLD-Footing11/21/200811/24/200811/24/2008 10:14:30 AMAPART
jim - around 10:00 Phone #: ###-####. Footing ok. Needs to remove gas line and plumbing cleanout within footing. Also noted to contractor to contact plumbing inspector on requirements for main sewer line being encased in a non structural slab.
ESC08-00986 Site Preparation11/24/200811/24/200811/24/2008 10:11:23 AMAFAIL
Needs to post ESC permit sign, provide waddlels or cover excavated soils with plastic, and provide concrete washout area. Verbal c/n given to RP.