ESC07-00513
| Random Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 4:30:00 PM | P | PASS |
|
|
|
BLD07-01087
| BLD-Energy code compliance | 11/24/2008 | 11/24/2008 | 11/24/2008 4:29:48 PM | P | PASS |
|
|
joe Phone #: ###-#### - please call 1/2 hr prior
|
BLD08-02068
| BLD-Final | 11/24/2008 | 11/24/2008 | 11/24/2008 2:55:49 PM | P | PASS |
|
|
jackie - please call 1/2 hr prior Phone #: ###-####
|
BLD08-02068
| DOC - Permit Finaled | 11/24/2008 | 11/24/2008 | 11/24/2008 2:52:10 PM | P | PASS |
|
|
Letter of completion issued.
|
ESC08-00951
| Random Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 2:03:15 PM | P | PASS |
|
|
ESC permit sign posted. Site was clean. BMP's ok.
|
BLD08-02324
| BLD-Framing/Rough-in | 11/24/2008 | 11/24/2008 | 11/24/2008 2:02:41 PM | P | PASS |
|
|
tim Phone #: ###-####
|
BLD08-01790
| BLD-Final | 11/20/2008 | 11/24/2008 | 11/24/2008 11:21:50 AM | A | NR |
|
|
chad Phone #: ###-####. Needs life/safety final first. Contacted Chad at number provided and left message.
|
ESC08-00927
| Site Preparation | 11/24/2008 | 11/24/2008 | 11/24/2008 10:38:59 AM | A | PART |
|
|
ESC permit sign posted. All BMP's in place. Conc. washout area has been established. Spoke with RP about extending the silt fence on the NW portion of job site to contain remaining excavated soils and to complete the deleniation of the property.
|
BLD08-02280
| BLD-Footing | 11/21/2008 | 11/24/2008 | 11/24/2008 10:36:44 AM | A | PART |
|
|
bob Phone #: ###-####. Exterior and interior footings.
|
BLD08-02407
| BLD-Footing | 11/21/2008 | 11/24/2008 | 11/24/2008 10:14:30 AM | A | PART |
|
|
jim - around 10:00 Phone #: ###-####. Footing ok. Needs to remove gas line and plumbing cleanout within footing. Also noted to contractor to contact plumbing inspector on requirements for main sewer line being encased in a non structural slab.
|
ESC08-00986
| Site Preparation | 11/24/2008 | 11/24/2008 | 11/24/2008 10:11:23 AM | A | FAIL |
|
|
Needs to post ESC permit sign, provide waddlels or cover excavated soils with plastic, and provide concrete washout area. Verbal c/n given to RP.
|