Inspections for the day of: Tuesday, November 24, 2009.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00468 INSP-Final Inspection11/24/200911/24/200911/25/2009 2:24:29 PMPFAIL
The corrections have been made on the notification circuits and a spot check of the EOL voltage drop passed. See the city approved plans for the initiating devices tested, as marked OK, on the plans. See the plans for doors that have been clouded that did not fully close. Two of the hvac units, one supply and one exhaust, did not function. The smoke dampers were not tested since access to the louvers was not available on all of the dampers. The duct detectors were not tested because the sample tube in the first one was mounted incorrectly, had not plug in the end and was made of EMT with holes drilled in it. It appears additional smoke detector coverage will be required at a stairwell door, I deferred the contractor to the plan reviewer on this item. Additional initiating devices need to be tested/verified such as the fire sprinkler risers and fire pump as well as all of the correction items addressed.
FIR09-00615 INSP-Final Inspection11/24/200911/24/200911/25/2009 11:20:56 AMPCANC
Cancel per HC Company.
FIR09-00633 INSP-Final Inspection11/24/200911/24/200911/25/2009 11:20:37 AMPCANC
Cancel per HC Company.
FIR09-00440 INSP-Sprinkler Rough-in11/23/200911/24/200911/24/2009 3:17:55 PMAPART
All of the attic system was inspected as well as just the east wing of the wet system. In several locations the sidewall heads are too close to one another and once the ceiling is installed may be too close to the ceiling. The contractor needs to contact Tim Frost about changes that could adversely effect the attic system hydraulic calculations. The location of acouple of the upright sprinkler heads need to be modified to provide correct sprinkler coverage. Earthquake bracing needs to be modified so that the "earthquake ears" are not used as discussed.
BLD09-01856 FIRE-Final Inspection11/23/200911/24/200911/24/2009 11:16:58 AMAFAIL
None of the doors or the related hardware have been installed. All other items are ok to pass when the doors are inspected.