PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 24, 2009
.
Number of inspections:
9
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00544
Tracking Control
11/24/2009
11/24/2009
11/24/2009 3:22:36 PM
A
FAIL
Message to RP:
Clean up all tracking onto Fairview. Remove landbridge off of the construction exit. Add additional rock to the west of the construction exit. Will re-inspect on 11/27/09 am.
ESC09-00625
Site Preparation
11/24/2009
11/24/2009
11/24/2009 3:01:37 PM
NR
ESC09-00682
Site Preparation
11/24/2009
11/24/2009
11/24/2009 2:21:33 PM
NR
ESC09-00554
BMP Violation
11/20/2009
11/24/2009
11/24/2009 1:24:27 PM
A
PASS
ESC09-00689
Site Preparation ESC
11/24/2009
11/24/2009
11/24/2009 10:43:38 AM
PASS
ESC09-00719
Site Preparation
11/24/2009
11/24/2009
11/24/2009 10:21:15 AM
A
CANC
Wrong date
ESC09-00749
BMP Violation
11/23/2009
11/24/2009
11/24/2009 9:51:24 AM
A
FAIL
Correction Notice to RP:
1. Vac up all non storm water that is collected within the back of the building.
2. Protect storm drain with an approved storm drain inlet protection.
3. Remove concrete concrete washout pit.
Failure to comply will result in a stop work order. Will re-inspect on 11/25/09AM
ESC09-00150
BMP Violation
11/20/2009
11/24/2009
11/24/2009 8:21:27 AM
A
FAIL
Verbal to RP:
Maintain, replace silt fence, or use a different type of sediment barrier along the canal. Will re-inspect on 11/27/09 am,
ESC09-00286
Conference
11/19/2009
11/24/2009
11/20/2009 10:41:39 AM
A
CANC
11/23/09 at 3:00pm