ELE98-02344
| INSP - Electrical Rough-In | 11/25/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | | PART |
|
|
/ / 315 - r/i ok
|
ELE98-02538
| INSP - Final | 11/25/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | | PART |
|
|
/ / 315 - t/o for area requested ok
|
ELE98-03365
| INSP - Final | 11/24/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | A | PASS |
|
|
11/25/98 315 - EMMITT..###-#### ok
|
ELE98-03383
| INSP - Electrical Rough-In | 11/24/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | A | PASS |
|
|
11/25/98 315 - ERIC...###-#### 22rms 2a/c
|
ELE98-04019
| INSP - Electrical Rough-In | 11/24/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | A | PART |
|
|
11/25/98 315 - BARRY ###-#### ok called Barry they need to strap mc cable better
|
ELE98-04066
| INSP - Electrical Rough-In | 11/24/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | A | FAIL |
|
|
11/25/98 315 - SCOTT...###-#### cor. and do not cover posted, 300-4 nail plates, 1 1/4 from edge of stud 370-16 box fill, 250-23 install bond screw,210-52 din. rm shall be on 20 amp,needs outlet left of range and other stuff see jf
|
ELE98-04140
| INSP - Final | 11/24/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | A | PASS |
|
|
11/25/98 315 - ELEC FOR ELEVATORS...BEN ###-#### 14 ok
|
ELE98-04129
| INSP - Electrical Rough-In | 11/23/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | P | PART |
|
|
11/25/98 315 - ###-#### 9rms 1a/c r/i ok p/s failed 110-14 (a) ringed th
|
ELE98-03734
| INSP - Electrical Rough-In | 11/25/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | P | PART |
|
|
11/25/98 315 - ABOVE GRID CEILING...GREG PAGER ###-#### r/i and t/o ok
|
ELE98-03000
| INSP - Final | 11/25/1998 | 11/25/1998 | 11/25/1998 12:00:00 AM | P | PASS |
|
|
11/25/98 315 - bernice ###-#### ok
|