Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00621 INSP-Final Inspection11/24/200811/25/200811/25/2008 4:41:30 PMADEFR
Please call 30 min prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton
FIR06-00620 INSP-Final Inspection11/24/200811/25/200811/25/2008 4:41:14 PMADEFR
Please call 30 min prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton
FIR08-00649 INSP-Sprinkler Rough-in/Hydro11/18/200811/25/200811/25/2008 4:34:25 PMAPART
Pump acceptance testing completed satisfactory per NFPA 20 guidelines.
FIR08-00649 INSP-Sprinkler Rough-in/Hydro11/25/200811/25/200811/25/2008 4:32:55 PMPPART
Hydrostatic re-test of overhead systems #3 and #5 passed.
BLD08-00951 FIRE-Final Inspection11/24/200811/25/200811/25/2008 4:30:41 PMAPASS
Fire life safety is satisfactory pending two exit signs are repaired and missing doors and hardware at some locations are installed prior to structural final as discussed.
FIR08-00565 INSP-Final Inspection11/25/200811/25/200811/25/2008 4:27:38 PMAPASS
Fire sprinkler permit passed final inspection.
FIR08-00635 INSP-Final Inspection11/24/200811/25/200811/25/2008 4:24:39 PMAPASS
Fire alarm field testing passed, permit finaled.
FIR08-00018 INSP-Sprinkler Rough-in/Hydro11/24/200811/25/200811/25/2008 4:21:43 PMAPART
Corrections at units 802 and 804 verified.
FIR07-01042 INSP-Sprinkler Rough-in/Hydro11/24/200811/25/200811/25/2008 4:17:24 PMAPART
1st floor wet system hydrostatic testing passed, plan resubmittals verified for changes at the overhead install for the first floor as well- okay for ceiling cover-see initialed area on plans.
BLD06-01188 FIRE-Final Inspection11/24/200811/25/200811/25/2008 2:28:32 PMAPASS
Fire life safety finaled.
FIR06-00595 INSP-Final Inspection11/25/200811/25/200811/25/2008 2:27:48 PMAPASS
Fire alarm permit finaled.
FIR08-00566 INSP-Final Inspection11/25/200811/25/200811/25/2008 12:23:18 PMAFAIL
Final pending field tile installation throughout at the drop ceilings
FIR08-00634 INSP-Final Inspection11/24/200811/25/200811/25/2008 12:20:38 PMAFAIL
Missing notification for conference room 203, indicator at ID address 5-50 is not functional, a/v testing postponed until revision is complete, remainder of in duct smokes tested okay.
BLD08-00950 FIRE-Final Inspection11/24/200811/25/200811/25/2008 12:14:52 PMANR
Need project related fire alarm and sprinkler permit finals prior to building life safety approval, also noted missing doors/hardware as several locations.