Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01146 Site Preparation11/25/201311/25/201311/25/2013 3:29:00 PMPPASS


Ready for excavation. Permit posted, Sunny Ridge development drop inlets have DI protection. Need to install construction entrance if materials and equipment are loaded from the adjacent empty lot.
ESC12-01078 General Inspection11/25/201311/25/201311/25/2013 12:23:34 PM PASS
Finaled.
ESC12-01078 DOC - Permit Finaled11/25/201311/25/201311/25/2013 12:23:17 PMPPASS
Patio and fence are complete. No further construction. BMPs and construction materials no longer on site. ESC conditions satisfied.
ESC12-00240 Aging Inspection11/25/201311/25/201311/25/2013 11:35:11 AM PASS
Stabilization in progress. Exterior work and parking lot are finished. Some interior is still in progress. Should remove barrel of cleaning solution on pallet if finished.
ESC13-00184 General Inspection11/25/201311/25/201311/25/2013 11:12:35 AM PASS
Finaled.
ESC13-00184 DOC - Permit Finaled11/25/201311/25/201311/25/2013 11:12:19 AMPPASS
Project is complete. BMPs have been removed. No further construction activity. ESC conditions satisfied.
ESC12-00344 Aging Inspection11/25/201311/25/201311/25/2013 10:56:15 AM PASS
Some minor work is ongoing, exterior work/earth work appears to be complete. No corrections at this time.
ESC12-00430 General Inspection11/25/201311/25/201311/25/2013 10:19:24 AM PASS
Exterior work complete. No trackout from project. Previous corrections have been completed
ESC12-01032 General Inspection11/25/201311/25/201311/25/2013 10:05:50 AM PASS
WIP. Permit posted, no trackout. No corrections at this time.
ESC13-00199 General Inspection11/25/201311/25/201311/25/2013 9:49:17 AM PASS
Individual lots now have vertical construction. BMPs are installed. No further development under this permit, but will need to monitor stabilization.
ESC13-01103 Site Preparation11/24/201311/25/201311/25/2013 9:25:40 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen.

RP on site to discuss conditions.. Riverside Heights 5 house. Southeast section has several projects. Concrete washout moved down street and cleaned up. Permit posted.
ESC13-00664 Site Preparation11/22/201311/25/201311/25/2013 9:11:14 AMAPASS
Houses under construction on both sides of lot. BMPs for Tahoe Homes are installed. Ready for excavation.
ESC12-00845 General Inspection11/25/201311/25/201311/25/2013 8:45:54 AM PASS