ESC13-01146
| Site Preparation | 11/25/2013 | 11/25/2013 | 11/25/2013 3:29:00 PM | P | PASS |
|
|
Ready for excavation. Permit posted, Sunny Ridge development drop inlets have DI protection. Need to install construction entrance if materials and equipment are loaded from the adjacent empty lot.
|
ESC12-01078
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 12:23:34 PM | | PASS |
|
|
Finaled.
|
ESC12-01078
| DOC - Permit Finaled | 11/25/2013 | 11/25/2013 | 11/25/2013 12:23:17 PM | P | PASS |
|
|
Patio and fence are complete. No further construction. BMPs and construction materials no longer on site. ESC conditions satisfied.
|
ESC12-00240
| Aging Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 11:35:11 AM | | PASS |
|
|
Stabilization in progress. Exterior work and parking lot are finished. Some interior is still in progress. Should remove barrel of cleaning solution on pallet if finished.
|
ESC13-00184
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 11:12:35 AM | | PASS |
|
|
Finaled.
|
ESC13-00184
| DOC - Permit Finaled | 11/25/2013 | 11/25/2013 | 11/25/2013 11:12:19 AM | P | PASS |
|
|
Project is complete. BMPs have been removed. No further construction activity. ESC conditions satisfied.
|
ESC12-00344
| Aging Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 10:56:15 AM | | PASS |
|
|
Some minor work is ongoing, exterior work/earth work appears to be complete. No corrections at this time.
|
ESC12-00430
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 10:19:24 AM | | PASS |
|
|
Exterior work complete. No trackout from project. Previous corrections have been completed
|
ESC12-01032
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 10:05:50 AM | | PASS |
|
|
WIP. Permit posted, no trackout. No corrections at this time.
|
ESC13-00199
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 9:49:17 AM | | PASS |
|
|
Individual lots now have vertical construction. BMPs are installed. No further development under this permit, but will need to monitor stabilization.
|
ESC13-01103
| Site Preparation | 11/24/2013 | 11/25/2013 | 11/25/2013 9:25:40 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen.
RP on site to discuss conditions.. Riverside Heights 5 house. Southeast section has several projects. Concrete washout moved down street and cleaned up. Permit posted.
|
ESC13-00664
| Site Preparation | 11/22/2013 | 11/25/2013 | 11/25/2013 9:11:14 AM | A | PASS |
|
|
Houses under construction on both sides of lot. BMPs for Tahoe Homes are installed. Ready for excavation.
|
ESC12-00845
| General Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 8:45:54 AM | | PASS |
|
|
|