BLD13-03344
| BLD-Other | 11/21/2014 | 11/21/2014 | | P | |
|
|
Dave can you go back to this address and see if it''s still locked up? She was suposed to close and move out. Thank you CAN
|
BLD14-02992
| BLD-Final | 11/25/2014 | 11/25/2014 | 11/26/2014 6:31:47 AM | P | NR |
|
|
Larry Phone #: ###-####
|
BLD14-01522
| BLD-Framing/Rough-in | 11/25/2014 | 11/25/2014 | 11/26/2014 6:30:54 AM | P | PASS |
|
|
john Phone #: ###-#### fire place
|
BLD14-02529
| BLD-Ceiling Grid Inspection | 11/25/2014 | 11/25/2014 | 11/26/2014 6:30:00 AM | P | PEND |
|
|
Ron Phone #: ###-#### ok to install border tile
|
BLD14-00521
| BLD-Framing/Rough-in | 11/24/2014 | 11/25/2014 | 11/25/2014 2:07:33 PM | P | PASS |
|
|
Clive Phone #: ###-####
|
GCB14-00116
| GCB-Final | 11/24/2014 | 11/25/2014 | 11/25/2014 10:15:26 AM | A | PASS |
|
|
Raina ###-#### c/n on site hand rails smoke and co2 detectors ect.
|
GCB14-00099
| GCB-Fndatn/slab ins/fld vent | 11/24/2014 | 11/25/2014 | 11/25/2014 10:14:06 AM | A | PASS |
|
|
Alvaro ###-#### - requested 9am inspection
|
GCB14-00140
| GCB-Energy | 11/24/2014 | 11/25/2014 | 11/25/2014 10:11:59 AM | A | PASS |
|
|
Mike ###-####
|
BLD14-02971
| BLD-Conference | 11/25/2014 | 11/25/2014 | | P | |
|
|
To verify plans match construction
|