BLD14-03366
| FIRE-Final Inspection | 11/17/2014 | 11/18/2014 | | P | |
|
|
Elise// please call 45 min prior Phone #: ###-####
|
FIR14-00602
| INSP-Conference | 11/25/2014 | 11/25/2014 | 11/26/2014 8:34:27 AM | P | DONE |
|
|
Mike and I discussed the location of the FDC and the control valve for the Server Room. I deferred any changes to Tim Frost for approval.
|
FIR14-00474
| INSP-Sprinkler Rough-in | 11/25/2014 | 11/25/2014 | 11/25/2014 3:11:34 PM | P | PASS |
|
|
Remaining ceilings are ok to install.
|
FIR13-00697
| INSP-Final Inspection | 11/20/2014 | 11/25/2014 | 11/25/2014 2:32:44 PM | P | FAIL |
|
|
Simplex is not yet monitoring the low air or the tamper switch for the new pre-action valve.
|
FIR13-00719
| INSP-Final Inspection | 11/24/2014 | 11/25/2014 | 11/25/2014 2:26:44 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00399
| INSP-Sprinkler Rough-in/Hydro | 11/25/2014 | 11/25/2014 | 11/25/2014 12:24:13 PM | P | PASS |
|
|
Overhead hydro test passed
|
FIR14-00424
| INSP-Sprinkler Rough-in/Hydro | 11/25/2014 | 11/25/2014 | 11/25/2014 12:23:46 PM | P | PASS |
|
|
Overhead hydro test passed
|
BLD14-00038
| FIRE-Final Inspection | 11/25/2014 | 11/25/2014 | 11/25/2014 12:05:32 PM | P | PASS |
|
|
Life safety passed
|
FIR14-00137
| INSP-Final Inspection | 11/25/2014 | 11/25/2014 | 11/25/2014 12:05:07 PM | P | PASS |
|
|
Permit finaled
|
BLD14-01115
| FIRE-Final Inspection | 11/24/2014 | 11/25/2014 | 11/25/2014 10:26:12 AM | A | FAIL |
|
|
Per Craig Hansen the fire dept access will be addressed at a later date when the two additional green houses are built. Also per Craig a knox box will not be required. Per John Menard door hardware to the mechanical areas is ok. Had to fail since the exit sign still does not work.
|
FIR14-00210
| INSP-Final Inspection | 11/24/2014 | 11/25/2014 | 11/25/2014 10:01:13 AM | A | PASS |
|
|
Permit finaled
|
BLD14-02414
| FIRE-Final Inspection | 11/24/2014 | 11/25/2014 | 11/25/2014 9:54:53 AM | A | PASS |
|
|
Life safety passed
|