PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 25, 2014
.
Number of inspections:
15
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-00106
General Inspection
11/25/2014
11/25/2014
11/25/2014 4:48:25 PM
CANC
rescheduled
ESC12-00364
General Inspection
11/25/2014
11/25/2014
11/25/2014 4:37:27 PM
PASS
ESC14-00296
Tracking Control
11/25/2014
11/25/2014
11/25/2014 4:05:41 PM
P
PEND
Onsite meeting with Boise ESC division and ESC representatives to discuss controlling trackout to Main Street.
The construction ramp out of the hole is too steep for placing rock and hole is still being excavated so it is not possible to have a rock entrance at this time.
Corrective actions:
1. Place matador (fiber) mats on top of two drop inlets on south side of Main Street in between Capital and 6th Street.
2. The entrance side of site is going to have pit run placed on it to prevent wheels from collecting mud upon entry.
3. 2 workers sweeping road in front of exit and knocking mud off tires.
4. Street sweeper to be onsite 2x daily during trackout events.
Street is currently in bad condition but ESI is in process of making corrections.
ESC14-00296
General Inspection
11/25/2014
11/25/2014
11/25/2014 1:21:20 PM
FAIL
Excessive trackout to Main St.
Contractor states that grade of construction access prevents putting rock down (loss of traction for dump trucks). Drop inlets have protection and alternative BMP is street sweeping (reportedly 2x daily).
ESC13-01200
General Inspection
11/25/2014
11/25/2014
11/25/2014 10:51:21 AM
PASS
ESC13-01199
General Inspection
11/25/2014
11/25/2014
11/25/2014 10:50:44 AM
PASS
4 plex in progress. Near completion. No ESC issues.
ESC14-00149
DOC - Permit Finaled
11/25/2014
11/25/2014
11/25/2014 9:27:55 AM
P
PASS
Andersen Construction called to confirm that SARMC interior TI is complete. ESC conditions satisfied.
ESC13-01305
Aging Inspection
11/25/2014
11/25/2014
11/25/2014 9:20:50 AM
PASS
Surrounding area stabile. Numerous permits in area so frequent inspections occuring.
ESC13-01305
DOC - Permit Finaled
11/25/2014
11/25/2014
11/25/2014 9:19:58 AM
P
PASS
ESC13-01297
Aging Inspection
11/25/2014
11/25/2014
11/25/2014 9:17:39 AM
PASS
Pine Tree Village unit in progress. Subdivision is self contained. DI protection and street sweeping are occuring. No erosion.
ESC13-01298
Aging Inspection
11/25/2014
11/25/2014
11/25/2014 9:16:44 AM
PASS
WIP
ESC13-01304
Aging Inspection
11/25/2014
11/25/2014
11/25/2014 9:15:31 AM
PASS
WIP on single unit. Apartment building complete/stabilized. No further ESC inspections
ESC13-01304
DOC - Permit Finaled
11/25/2014
11/25/2014
11/25/2014 9:15:20 AM
P
PASS
ESC13-01303
Aging Inspection
11/25/2014
11/25/2014
11/25/2014 9:15:09 AM
PASS
WIP on single unit. Apartment building complete/stabilized. No further ESC inspections. Permit finaled.
ESC13-01303
DOC - Permit Finaled
11/25/2014
11/25/2014
11/25/2014 9:14:48 AM
P
PASS