ELE19-02723
| Final | 11/22/2019 | 11/25/2019 | 11/25/2019 3:23:31 PM | P | PASS |
|
|
Any questions feel free to call Bill at the above number. Phone #: ###-#### Inspection requested via web by Sherry Allen Unit at South East corner of intercection near 12185 Hickory. No load present at time of inspection. Final ok
|
ELE19-00602
| Electrical Rough-In | 11/22/2019 | 11/25/2019 | 11/25/2019 2:47:23 PM | P | PASS |
|
|
6th floor east PT deck cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Pour noted rough in ok cover
|
ELE19-03585
| Electrical Rough-In | 11/25/2019 | 11/25/2019 | 11/25/2019 2:05:20 PM | P | PASS |
|
|
Ceiling grid Phone #: ###-#### Inspection requested via web by Jim Williams Grid rough in ok cover
|
ELE19-03678
| Electrical Rough-In | 11/22/2019 | 11/25/2019 | 11/25/2019 1:31:46 PM | A | FAIL |
|
|
Would like to meet with Rock again. He gave me my preliminary meeting. I have the wires pulled through the walls and getting close to outlets and closing in. Thanks. Phone #: ###-#### Inspection requested via web by Curtis Hoovestol Building permit finaled in january. 250.24(A)(5)- Grounding and grounded conductors shall be connected on load side of service. Need a equipment grounding conductor to sub panel in shop. 250.118- All non current carrying metal parts of equiment shall be connected to as equipment grounding conductor. Complete make-up so inspector can inspect connections. 314.29- Covers for conduit bodies shall remain accessible, Owner to build access for LB under panel. 334.30- NM cables shall be secured with in 12'" of entering panel. 406.12- All receptacle outlets installed in a residential garage shall be tamper resistant type.
|
ELE19-04204
| Electrical Rough-In | 11/22/2019 | 11/25/2019 | 11/25/2019 9:56:34 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Box front garage light. Secure NM above small panel. NM sheathing shall enter boxes a min of 1/4" Torque main bonding jumper screws. Secure dryer box. Recessed can covers shall be completely installed, up loft, above master vanity, kitchen. Furnace temp hook up shall be in a box. no more than 12' between receptacle outlets in S.E. rm.
|
ELE19-04394
| Rough-In Permanent Service | 11/22/2019 | 11/25/2019 | 11/25/2019 8:49:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by danny perrine Rough in ok cover p/s u/g n ok
|