MEC97-03532
| INSP - Rough-in & Gas Pressure | 11/26/1997 | 11/26/1997 | 11/28/1997 12:00:00 AM | P | PART |
|
|
11/26/97 301 - gas 28773/28719 ok UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
MEC97-03533
| INSP - Retro Fit (check note) | 11/26/1997 | 11/26/1997 | 11/28/1997 12:00:00 AM | P | PASS |
|
|
11/26/97 301 - FURN,GAS LINE,WH--READY 3:00 FNL -OK FINAL
|
BLD97-02956
| INSP - Framing/Rough-in | 11/26/1997 | 11/26/1997 | 11/28/1997 12:00:00 AM | P | PASS |
|
|
11/26/97 301 - Wanted an additional inspection if you don't pass him at FRAM-OK FRAMING
|
BLD97-03134
| INSP - Footings | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | CANC |
|
|
11/26/97 301 - contractor call and cancled via cell phone call to 301 in
|
BLD97-03266
| INSP - Final | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PART |
|
|
11/26/97 301 - temp ok w/ c/n and agreement on file
|
BLD96-03081
| INSP - Roof | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PASS |
|
|
11/26/97 301 - KEVIN WILL CALL YOU TO DISCUSS THIS // no call from kevin the airport roof and info. to insp.
|
BLD97-00042
| INSP - Final | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PART |
|
|
11/26/97 301 - READY AT 12:00 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED p.w. sign off required. c/n f relocation of heating units and all others to have prem occ. sign off.
|
BLD97-01347
| INSP - Final | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PASS |
|
|
11/26/97 301 - CALL DOUG AT ###-#### FNL -OK FINAL routed for admit. sign-offs.
|
BLD97-01410
| INSP - Framing/Rough-in | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PASS |
|
|
11/26/97 301 - CALL JOE AT ###-#### AND HE WILL MEET YOU FNL -OK FINAL
|
BLD97-01479
| INSP - Conference | 11/26/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PASS |
|
|
as per jstorey, ok to change roof style to 25 year architectural and okay to extend permit for 6months.mps
|
BLD97-02036
| INSP - Foundation | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PART |
|
|
11/26/97 301 - re-bar correction to be made of #4 to #5 in horrs and #5 special insp to ferify as per approved plan.
|
BLD97-02107
| INSP - Framing/Rough-in | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | A | PASS |
|
|
11/26/97 301 - FRAM-OK FRAMING
|
BLD97-02956
| INSP - Framing/Rough-in | 11/25/1997 | 11/26/1997 | 11/26/1997 12:00:00 AM | P | PART |
|
|
11/26/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to insulate
|