ELE01-03299
| Electrical Rough-In | 11/23/2001 | 11/26/2001 | 11/26/2001 12:00:00 AM | A | PASS |
|
|
###-#### CEILING. ceiling lobby r/i. 11/26/2001 9:11:14 AM
|
ELE01-03846
| Electrical Rough-In | 11/26/2001 | 11/26/2001 | 11/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 09:48:32. Contact: ###-####. ufer ground concrete pour completed. 11/26/2001 6:32:35 PM
|
ELE00-04620
| Final | 11/26/2001 | 11/26/2001 | 11/26/2001 12:00:00 AM | P | PASS |
|
|
###-#### ALLAN. completed. 11/26/2001 3:16:34 PM
|
ELE01-03846
| Final | 11/26/2001 | 11/26/2001 | 11/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 403 On 11/26/2001 6:33:07 PM
|
ELE00-01560
| Electrical Rough-In | 11/21/2001 | 11/26/2001 | 11/26/2001 12:00:00 AM | P | PASS |
|
|
###-#### DAVE. 5th floor; ceiling r/i, lobby and corridorl. 11/26/2001 2:24:24 PM
|