Inspections for the day of: Monday, November 26, 2001.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-03299 Electrical Rough-In11/23/200111/26/200111/26/2001 12:00:00 AMAPASS
###-#### CEILING. ceiling lobby r/i. 11/26/2001 9:11:14 AM
ELE01-03846 Electrical Rough-In11/26/200111/26/200111/26/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/26/2001 at 09:48:32. Contact: ###-####. ufer ground concrete pour completed. 11/26/2001 6:32:35 PM
ELE00-04620 Final11/26/200111/26/200111/26/2001 12:00:00 AMPPASS
###-#### ALLAN. completed. 11/26/2001 3:16:34 PM
ELE01-03846 Final11/26/200111/26/200111/26/2001 12:00:00 AMPPASS
Added by Inspector: 403 On 11/26/2001 6:33:07 PM
ELE00-01560 Electrical Rough-In11/21/200111/26/200111/26/2001 12:00:00 AMPPASS
###-#### DAVE. 5th floor; ceiling r/i, lobby and corridorl. 11/26/2001 2:24:24 PM