Inspections for the day of: Monday, November 26, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02596 BLD-Conference11/20/200111/26/200111/26/2001 12:00:00 AMAPART
###-#### MARK
framing conf., nothing in particular 11/26/2001 11:50:22 AM
BLD01-01179 BLD-Final11/23/200111/26/200111/26/2001 12:00:00 AMAPASS
c of c issued 11/26/2001 10:31:28 AM
BLD01-01560 BLD-Foundation11/25/200111/26/200111/26/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/25/2001 at 05:47:53. Contact: .
wip, pending si report 11/26/2001 10:25:06 AM
BLD01-02184 BLD-Foundation11/25/200111/26/200111/26/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/25/2001 at 05:49:08. Contact: .
wip, pending si report 11/26/2001 10:24:49 AM
BLD01-02282 BLD-Framing/Rough-in11/26/200111/26/200111/26/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/26/2001 at 07:28:13. Contact: ###-####.c/n posted, ok to insulate 11/26/2001 4:03:11 PM
BLD01-02281 BLD-Framing/Rough-in11/26/200111/26/200111/26/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/26/2001 at 07:29:06. Contact: ###-####.
c/n posted 11/26/2001 4:02:40 PM
BLD01-02565 BLD-Footing11/26/200111/26/200111/26/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/26/2001 at 07:40:41. Contact: ###-####.
wip, verified soil letter 11/26/2001 3:54:03 PM
BLD99-01905 BLD-Final11/26/200111/26/200111/26/2001 12:00:00 AMPPASS
fn --mary ###-#### -re-insp