ELE02-03607
| Final | 11/19/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok 11/26/2002 11:12:37 AM
|
ELE02-03139
| Electrical Rough-In | 11/25/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | A | PART |
|
|
###-#### follow up r/i 314.43 no screws allowed in non metallic boxes and watch box fill 11/26/2002 11:49:22 AM
|
ELE02-03633
| Rough-In Permanent Service | 11/25/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | A | PASS |
|
|
###-#### electrode ok for cover
p/s u/g new ok 11/26/2002 12:46:43 PM
|
ELE02-03109
| Temporary Service | 11/25/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 14:48:50. Contact: ###-####. cor. posted called 310.12(C) & 250.119 shall not use green for phase conductors, 110.12(A) seal ko 11/26/2002 12:14:59 PM
|
ELE02-02775
| Final | 11/26/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | P | FAIL |
|
|
fn charles- ###-#### 210.11(C)(3) requires 20 amp circuit for new bathroom, 110.3(B) fan light over shower requires gfci , per manufactures instructions met with owner correction posted 11/26/2002 4:33:27 PM
|
ELE02-02246
| Final | 11/26/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok 11/26/2002 3:46:29 PM
|
ELE02-02685
| Electrical Rough-In | 11/26/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | P | PART |
|
|
conference ok correction posted 110.26(E),(F)(1) for electrical gear added oon 2 nd floor
|
ELE02-03154
| Electrical Rough-In | 11/25/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 13:01:14. Contact: ###-####. conference ok for new building used as sewing next to house 11/26/2002 3:26:05 PM
|
ELE02-01560
| Final | 11/25/2002 | 11/26/2002 | 11/26/2002 12:00:00 AM | P | PASS |
|
|
PETE ###-#### ok 11/26/2002 6:02:43 PM
|