Inspections for the day of: Tuesday, November 26, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02608 BLD-Final11/25/200211/26/200211/26/2002 12:00:00 AMACANC
DAVE THIS IS FOR OCCUPANCY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-02881 BLD-Conference11/25/200211/26/200211/26/2002 12:00:00 AMADONE
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs they have a premit and an engineer coming out to the site to look at what they have allready done to sign off shear 11/26/2002 11:07:53 AM
BLD02-00581 BLD-Final11/25/200211/26/200211/26/2002 12:00:00 AMAFAIL
###-#### c/n on site 11/26/2002 10:45:39 AM
BLD02-02551 BLD-Footing11/25/200211/26/200211/26/2002 12:00:00 AMAPASS
###-####
BLD02-02535 BLD-Footing11/25/200211/26/200211/26/2002 12:00:00 AMAPART
###-#### ftg for basement section of home all rebar in forms are up setbacks look ok but are rigthon on front and north side 11/26/2002 11:42:57 AM
BLD02-02255 BLD-Framing/Rough-in11/26/200211/26/200211/26/2002 12:00:00 AMPPART
mike- shear; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ext shear ok to cover ext 11/26/2002 1:06:36 PM
BLD02-01282 BLD-Final11/26/200211/26/200211/26/2002 12:00:00 AMPFAIL
rj smith; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n on site insulate rim in crawel and outlet boxes on ext walls 11/26/2002 2:47:45 PM
MEC02-03244 Rough-in11/26/200211/26/200211/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/26/2002 at 08:39:26. Contact: ###-####. ext fireplace ok to cover 11/26/2002 1:36:56 PM
MEC02-03439 Rough-in11/26/200211/26/200211/26/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/26/2002 at 09:39:45. Contact: .c/n on site need to finish framing around fire place and gas piping with turn off and pressure test 11/26/2002 5:00:28 PM
MEC02-03371 Rough-in11/26/200211/26/200211/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/26/2002 at 09:41:16. Contact: .
BLD02-01800 BLD-Footing11/26/200211/26/200211/26/2002 12:00:00 AMPPASS
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs garage ftgs ok to pour 11/26/2002 4:59:12 PM
BLD02-02505 BLD-Framing/Rough-in11/26/200211/26/200211/26/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/26/2002 at 11:26:40. Contact: ###-####. c/n items posted am today not done 11/26/2002 12:53:56 PM