Inspections for the day of: Tuesday, November 26, 2002.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00405 INSP-Supply line flush11/25/200211/26/200211/26/2002 12:00:00 AMAPASS
supply line flush ok 11/26/2002 11:01:22 AM
BLD02-02429 FIRE-Final Inspection11/25/200211/26/200211/26/2002 12:00:00 AMAPASS
fire life/safety OK 11/26/2002 8:13:12 AM
BLD00-00672 FIRE-Final Inspection11/25/200211/26/200211/26/2002 12:00:00 AMPPASS
fire life/safety finaled 11/26/2002 1:50:43 PM
BLD02-00841 FIRE-Final Inspection11/26/200211/26/200211/26/2002 12:00:00 AMPPASS
Life safety finaled. The contractor has not installed the door at the bottom of the stairs yet and will need to have the hardware verified by the structural inspector 11/26/2002 3:24:08 PM
FIR02-00375 INSP-Final Inspection11/25/200211/26/200211/26/2002 12:00:00 AMPPASS
fire alarm finaled 11/26/2002 3:50:11 PM