Inspections for the day of: Wednesday, November 26, 2008.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01424 General Inspection11/26/200811/26/200811/26/2008 3:36:04 PMPPASS
looked ok
ESC08-00825 General Inspection11/26/200811/26/200811/26/2008 3:35:09 PMPPASS
looked ok
ESC08-00893 General Inspection11/26/200811/26/200811/26/2008 3:34:20 PMPPASS
looked ok
ESC08-00984 General Inspection11/26/200811/26/200811/26/2008 3:33:28 PMAPASS
looked ok
ELE08-02873 Final11/26/200811/26/200811/26/2008 3:32:16 PMPPASS
eric Phone #: ###-#### met contractor, ok to final, signed occupancy card
ESC08-00516 General Inspection11/26/200811/26/200811/26/2008 3:15:56 PMAPASS
looked ok
ESC07-00872 General Inspection11/26/200811/26/200811/26/2008 3:06:15 PMAPASS
looked ok
ELE08-02849 Rough-In Permanent Service11/26/200811/26/200811/26/2008 2:28:28 PMPPASS
ready for trench inspection Phone #: ###-#### Internet Inspection Request from: gary batten ric ok p/s u/g n ok, no esc this project
ELE08-03108 Rough-In Permanent Service11/25/200811/26/200811/26/2008 1:35:58 PMPPASS
Dan Phone #: ###-#### ric ok, p/s u/g rec ok
ELE08-02230 Electrical Rough-In11/26/200811/26/200811/26/2008 1:20:38 PMPPASS
Linda late as possible Phone #: ###-#### ric ok for basement and upstairs room, ok to pour concrete encased electrode
ELE08-02563 Electrical Rough-In11/25/200811/26/200811/26/2008 1:00:10 PMPPART
Scheduled by a contractor via Hello! on 11/25/2008 at 10:41:44 AM. Contact: ###-####. ric ok anop, no esc this project
ELE08-02562 Final11/25/200811/26/200811/26/2008 12:18:00 PMPPART
Scheduled by a contractor via Hello! on 11/25/2008 at 10:43:55 AM. Contact: ###-####. ok to final part anop, no esc this project
ELE08-02954 Final11/26/200811/26/200811/26/2008 10:34:52 AMPPASS
Office please call first for access Phone #: ###-#### ok to final, no esc this project
ELE08-03124 Electrical Rough-In11/25/200811/26/200811/26/2008 10:28:54 AMACANC
contact: Bob Schroder
****Partial Rough Inspection Phone #: ###-#### Internet Inspection Request from: Julie Schroder called contractor, he said the bld is not done and he doesn't have approved set of plans, so told him to call when everything is in place, no esc this project
ELE08-03125 Electrical Rough-In11/25/200811/26/200811/26/2008 10:22:55 AMAPASS
Please call Jeff Creek if any problems with inspection at ###-####. Thanks, Andrea. Phone #: ###-#### Internet Inspection Request from: Andrea Creek ric ok
ELE08-03116 Permanent Service11/25/200811/26/200811/26/2008 9:48:24 AMAPASS
joe Phone #: ###-#### p/s u/g rec ok, no esc this project
ELE08-03076 Final11/25/200811/26/200811/26/2008 9:24:30 AMAPASS
darin Phone #: ###-#### Note: please call 1/2 hr prior to inspection to meet with called, left survey,NEC 110.16 shall provide flash protection labels, 110.22 shall identify disconnects, no esc this project
ELE08-00409 Electrical Rough-In11/25/200811/26/200811/26/2008 8:51:42 AMAPASS
joe Phone #: ###-#### atrium north and south walls for ilf only ok to cover
ELE08-03122 Permanent Service11/25/200811/26/200811/26/2008 8:13:27 AMAPASS
p/s u/g n ok
ELE08-02994 Permanent Service11/25/200811/26/200811/26/2008 8:12:44 AMAPASS
p/s u/g n ok
ELE08-02994 Rough-In Permanent Service11/25/200811/26/200811/26/2008 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 11/25/2008 at 12:50:46 PM.
ELE08-03122 Rough-In Permanent Service11/25/200811/26/200811/26/2008 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 11/25/2008 at 12:53:09 PM.
ELE08-02393 Final11/26/200811/26/200811/26/2008 12:00:00 AMPCANC
andy-please call at least 15 mins prior to inspection Phone #: ###-####