Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02225 BLD-Concrete11/26/200811/26/200811/26/2008 4:48:52 PMPCANC
before 3=alex Phone #: ###-####
BLD08-02225 BLD-Framing/Rough-in11/26/200811/26/200811/26/2008 4:28:59 PMPPASS
before 3=alex Phone #: ###-####. Framing for floor infill ok. Was as per approved plan.
ESC08-00913 Site Preparation11/26/200811/26/200811/26/2008 4:22:04 PMPPART
Needs to provide drain inlet rotection in parkinglot. Verbal c/n given.
ESC08-00988 Site Preparation11/26/200811/26/200811/26/2008 4:21:23 PMPPASS
ESC permit sign posted. Excavated soil is contained in backyard. ok.
BLD08-02408 BLD-Footing11/26/200811/26/200811/26/2008 4:20:39 PMPPASS
PHIL Phone #: ###-####
BLD08-01253 BLD-Final11/26/200811/26/200811/26/2008 3:06:36 PMPNR
jim Phone #: ###-####
BLD08-02168 BLD-Framing/Rough-in11/25/200811/26/200811/26/2008 3:02:58 PMPPART
jeramia Phone #: ###-####. Framing ok. Also check ESC permit. Needs to resubmit elevation drawings for canges to windows and using stucco.
ESC08-00865 Random Inspection11/26/200811/26/200811/26/2008 2:51:00 PMPFAIL
Sweep sidewalk and gutter pan. Also needs to pickup remaining const. debri. c/n was posted.
BLD08-02155 BLD-Energy code compliance11/25/200811/26/200811/26/2008 1:14:16 PMAPART
randy Phone #: ###-####. Neesds to provide draftstop on open web floor joist and fireblock at ceiling level from crawlspace to basement ceiling transition. Contacted Randy.
ESC08-00858 Random Inspection11/26/200811/26/200811/26/2008 1:12:36 PMAPASS
BLD08-02155 BLD-Framing/Rough-in11/25/200811/26/200811/26/2008 1:11:46 PMAPASS
randy Phone #: ###-####. REviewed aditional engineering for bearings. ok.
BLD08-01677 BLD-Final11/25/200811/26/200811/26/2008 11:56:31 AMAPASS
andrew Phone #: ###-####
BLD08-01677 DOC - Permit Finaled11/26/200811/26/200811/26/2008 11:56:21 AMPPASS
Letter of compliance issued.
ESC08-00656 Site Final11/26/200811/26/200811/26/2008 11:55:59 AMAPASS
70% reveg. ok. Site is clean.
ESC08-00966 Site Preparation11/26/200811/26/200811/26/2008 11:03:02 AMAPASS
ESC permit sign posted. BMP's ok.
BLD08-02356 BLD-Footing11/25/200811/26/200811/26/2008 11:01:39 AMAPASS
Scheduled by a contractor via Hello! on 11/25/2008 at 2:18:38 PM. Contact: ###-####.
BLD08-02456 BLD-Final11/25/200811/26/200811/26/2008 10:42:43 AMADONE
Phone #: ###-#### Internet Inspection Request from: Dee Dee Fields
BLD08-02456 DOC - Permit Finaled11/26/200811/26/200811/26/2008 10:42:33 AMPPASS
Work appears to be done in accordance with local codes and ordinances.
BLD08-02414 BLD-Final11/25/200811/26/200811/26/2008 10:41:52 AMADONE
Phone #: ###-#### Internet Inspection Request from: Dee Dee Fields
BLD08-02414 DOC - Permit Finaled11/26/200811/26/200811/26/2008 10:41:43 AMPPASS
Work appears to be done in accordance with local codes and ordinances.
ESC08-00448 Random Inspection11/26/200811/26/200811/26/2008 10:23:52 AMAPASS
BLD08-01078 BLD-Conference11/25/200811/26/200811/26/2008 10:19:36 AMADONE
ANDY Phone #: ###-####
ESC08-00912 Random Inspection11/25/200811/26/200811/26/2008 9:45:05 AMAPASS
ESC permit sign posted. All const. debries are contained. Site was clean.
BLD08-02250 BLD-Framing/Rough-in11/25/200811/26/200811/26/2008 9:44:15 AMAPASS
ray Phone #: ###-####
ESC08-00944 Random Inspection11/25/200811/26/200811/26/2008 9:35:35 AMAPART
Needs to sweep sidewalk and gutter pan. c/n posted.
BLD08-02313 BLD-Framing/Rough-in11/25/200811/26/200811/26/2008 9:34:58 AMAPASS
ray Phone #: ###-####