FIR11-00503
| FIR-Aging Inspection | 11/26/2012 | 11/26/2012 | 11/29/2012 11:24:06 AM | | NR |
|
|
Charlie is going to try to schedule this for next week
|
BLD12-01243
| FIRE-Final Inspection | 11/26/2012 | 11/26/2012 | 11/26/2012 3:54:54 PM | P | PASS |
|
|
Life safety passed.
|
BLD12-00364
| FIRE-Conference | 11/26/2012 | 11/26/2012 | 11/26/2012 3:42:28 PM | P | DONE |
|
|
The life safety will be ok to final when the project related fire alarm permit is complete.
|
FIR12-00638
| INSP-Sprinkler Rough-in/Hydro | 11/21/2012 | 11/26/2012 | 11/26/2012 3:28:59 PM | A | PART |
|
|
The overhead hydro test passed. The underground supply line still is not ok for cover due to the minimum depth not being met.
|
BLD10-01877
| FIRE-Final Inspection | 11/21/2012 | 11/26/2012 | 11/26/2012 2:52:01 PM | A | PASS |
|
|
Life safety passed. Contractor is going to adjust the drop rate of the fire door and provide verification
|
FIR12-00532
| INSP-Alarm Testing | 11/26/2012 | 11/26/2012 | 11/26/2012 2:50:03 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00535
| INSP-Alarm Testing | 11/26/2012 | 11/26/2012 | 11/26/2012 2:49:29 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00349
| INSP-Final Inspection | 11/20/2012 | 11/26/2012 | 11/26/2012 9:42:38 AM | A | FAIL |
|
|
All items tested ok. Need resubmittals addressing the manual pull station that was deleted in the field.
|