Inspections for the day of: Tuesday, November 26, 2013.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01001 FIRE-Conference11/26/201311/26/201311/26/2013 5:22:24 PMPDONE
Regarding project related fire sprinkler work, fire dept access, and signage.
FIR12-00639 INSP-Sprinkler Rough-in11/25/201311/26/201311/26/2013 5:19:24 PMAFAIL
Inspection for cover at the second floor (3rd level) failed due to installation not matching plans- calc area included. Provide plan modification for changes prior to approval for cover.
FIR13-00427 INSP-Final Inspection11/26/201311/26/201311/26/2013 5:15:35 PMPPASS
Scope of permit work passed final walkthrough. Fire sprinkler permit finaled.
FIR13-00649 INSP-Final Inspection11/25/201311/26/201311/26/2013 5:06:39 PMAPASS
Scope of fire alarm work passed field testing. Permit finaled.
BLD13-02534 FIRE-Final Inspection11/26/201311/26/201311/26/2013 5:04:13 PMAPASS
Fire life safety finaled.