BLD12-01001
| FIRE-Conference | 11/26/2013 | 11/26/2013 | 11/26/2013 5:22:24 PM | P | DONE |
|
|
Regarding project related fire sprinkler work, fire dept access, and signage.
|
FIR12-00639
| INSP-Sprinkler Rough-in | 11/25/2013 | 11/26/2013 | 11/26/2013 5:19:24 PM | A | FAIL |
|
|
Inspection for cover at the second floor (3rd level) failed due to installation not matching plans- calc area included. Provide plan modification for changes prior to approval for cover.
|
FIR13-00427
| INSP-Final Inspection | 11/26/2013 | 11/26/2013 | 11/26/2013 5:15:35 PM | P | PASS |
|
|
Scope of permit work passed final walkthrough. Fire sprinkler permit finaled.
|
FIR13-00649
| INSP-Final Inspection | 11/25/2013 | 11/26/2013 | 11/26/2013 5:06:39 PM | A | PASS |
|
|
Scope of fire alarm work passed field testing. Permit finaled.
|
BLD13-02534
| FIRE-Final Inspection | 11/26/2013 | 11/26/2013 | 11/26/2013 5:04:13 PM | A | PASS |
|
|
Fire life safety finaled.
|