Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-00879 BLD-Final11/20/201311/22/2013 A 
JOEY Phone #: ###-####
BLD13-03155 BLD-Other11/25/201311/26/201311/27/2013 8:04:30 AMPDONE
Sign installation. Phone #: ###-#### >> Inspection requested via web by Martin Ackerman
BLD13-02159 BLD-Final11/25/201311/26/201311/26/2013 4:09:45 PMPNR
please call Deven at ###-####- Fire final also called in for PM inspection on Tuesday.
Thank you Mike- Nate-ESI Phone #: ###-#### >> Inspection requested via web by nate hutton. Needs fire/life/safety inspection. not yet completed as of 4:00pm.
BLD13-01688 BLD-Framing/Rough-in11/26/201311/26/201311/26/2013 2:58:53 PMPPART
Charles Phone #: ###-####. Exterior steel stud framed walls for phase 1 partA patient addition at gridlines 1 to 4 and on gridlines G to J. All work per the contractors egineering. Will get copy to have scanned into case. Noted that contractor is lacking shot spacing on the bottom track connection to concrete. Will reinspect on next inspection. ok to cover exterior only.
BLD13-03224 BLD-Footing11/26/201311/26/201311/26/2013 1:44:15 PMPPASS
steve Phone #: ###-####
BLD13-02340 BLD-Final11/25/201311/26/201311/26/2013 1:43:51 PMPPASS
Kevin Phone #: ###-####. ok for perm occ.
BLD13-03089 BLD-Foundation11/26/201311/26/201311/26/2013 12:20:01 PMPCANC
Inspection cancelled from web by: Paul Thompson
BLD13-03089 BLD-Foundation11/24/201311/26/201311/26/2013 10:17:32 AMANR
>> Inspection requested via web by Paul Thompson. Moved to pm.
BLD13-01289 BLD-Wall cover11/25/201311/26/201311/26/2013 10:02:37 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st and 2nd. floor north and south units, firestopping, and shearwalls ok. central units, 2nd. floor only.